Home › ENGINE ยท 2KD-FTV › INTAKE › INTAKE MANIFOLD

INTAKE MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL INTAKE MANIFOLD


    A148136E01
  1. Temporarily install a new gasket and the manifold with the 2 nuts and 4 bolts.

  1. Tighten the 2 nuts and 4 bolts in the order shown in the illustration.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

    NOTICE:

    1. A149937E01
    2. When installing the intake manifold, make sure that the No. 1 manifold insulator is not pinched.
    1. Make sure that the swirl control valve actuator is not damaged by surrounding parts.

  1. Connect the vacuum hose and connector to the VSV.



2. INSTALL INTAKE MANIFOLD INSULATOR


    A148159E01
  1. Install the insulator with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



3. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY


A098898E01
  1. Temporarily install the leakage pipe with the 3 bolts.

  1. Temporarily install a new gasket with the check valve.

  1. Fully tighten the 3 bolts and check valve.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf } for check valve
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt

  1. Connect the 2 fuel hoses.



4. INSTALL INJECTION PIPE


G038585E02

NOTICE:
  1. When replacing the injector, also replace the injection pipe.
  2. Keep the joints of the injection pipe clean.

  1. Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.

  1. Install the No. 2 and No. 3 injection pipe clamps with the bolt and 2 nuts, as shown in the illustration.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    HINT:
    If the painted mark on the No. 1 injection pipe has disappeared, use the illustration as a reference to install the clamps.



    A098972E04
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).



    A098893E01
  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install 2 new injection pipe clamps with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 ft.*lbf }

    NOTICE:
    1. Make sure that the inner-rubbers of the injection pipe fit inside the clamps.
    2. When installing the pipe, check that the inner-rubbers and the clamps are in their proper positions.



    A098973E04
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with union nut wrench
    35 N*m{ 357 kgf*cm , 26 ft.*lbf } for use without union nut wrench

    HINT:
    Use a torque wrench with a fulcrum length of 30 cm (11.81 in.).



5. INSTALL NO. 3 INTERCOOLER SUPPORT BRACKET


    A149935
  1. Install the support bracket with the bolt.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }



6. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY


A152338
  1. Temporarily install the leakage pipe with the 3 bolts.

  1. Temporarily install a new gasket with the check valve.

  1. Tighten the 3 bolts and check valve.

    Torque:
    for check valve:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }

  1. Connect the 3 fuel hoses.



7. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY

NOTICE:
  1. When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
  2. Keep the joints of the injection pipe clean.



    A152275
  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    1. If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection clamp with a new one.
    2. Make sure that the inner-rubbers of the injection pipe fit inside the clamp.
    3. When installing the pipe, check that the inner rubbers and the clamp are in their proper positions.



    A152280E02
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Using a union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).



8. INSTALL EGR COOLER
  1. Install the cooler (Click here).



9. INSTALL OIL DIPSTICK GUIDE


    A148132
  1. Install a new O-ring to the guide.

  1. Apply a small amount of clean engine oil to the O-ring.

  1. Install the guide with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install the injection pipe clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



10. INSTALL MANIFOLD STAY


    A148131
  1. Install the stay with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Connect the 3 vacuum hoses to the 2 VSV.



11. BLEED AIR FROM FUEL SYSTEM


12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


13. CHECK FOR FUEL LEAKS

CAUTION:
  1. During Active Test mode, engine speed becomes high and combustion noise becomes loud, so pay attention.
  2. During Active Test mode, fuel becomes high-pressured. Be extremely careful not to expose your eyes, hands, or body to escaped fuel.

  1. Check that there are no leaks from any part of the fuel system when the engine is stopped. If there is fuel leakage, repair or replace parts as necessary.

  1. Start the engine and check that there are no leaks from any part of the fuel system. If there is fuel leakage, repair or replace parts as necessary.

  1. Disconnect the return hose from the common rail.

  1. Start the engine and check for fuel leaks from the return pipe.
    If there is fuel leakage, replace the common rail.

  1. Connect the intelligent tester to the DLC3.

  1. Start the engine and push the intelligent tester main switch on.

  1. Select the Fuel Leak test from the Active Test mode on the intelligent tester.

  1. If the intelligent tester is not available, fully depress the accelerator pedal quickly. Increase the engine speed to the maximum and maintain that speed for 2 seconds. Repeat this operation several times.

  1. Check that there are no leaks from any part of the fuel system.

    NOTICE:
    A return pipe leakage of less than 10 cc (0.6 cu in.) per minute is acceptable.

    If there is fuel leakage, repair or replace parts as necessary.

  1. Reconnect the return hose to the common rail.



14. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.