Home › ENGINE ยท 2KD-FTV › COOLING › WATER PUMP (w/ EGR Cooler)

WATER PUMP (w/ EGR Cooler) > INSTALLATION

for Preparation Click here



1. INSTALL WATER PUMP ASSEMBLY


    A225339
  1. Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



2. INSTALL CYLINDER BLOCK INSULATOR


    A149941
  1. Install the block insulator to the head.



3. INSTALL NO. 2 TIMING BELT COVER


A060279E01
  1. Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    After applying FIPG, install the No. 2 timing belt cover within 3 minutes and tighten its bolts and nut within 15 minutes.

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



4. INSTALL CAMSHAFT TIMING PULLEY


A060182E01
  1. Install the camshaft timing pulley.

  1. Fasten the bolt of the camshaft timing pulley by holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1000 kgf*cm , 72 ft.*lbf }



5. INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY


6. INSTALL TIMING BELT


    A070691E02
  1. Check that the timing marks are aligned as shown in the illustration.

    HINT:
    If reusing the timing belt, align the points marked during removal, and install the belt with the arrow pointing in the direction of engine revolution.

    NOTICE:
    1. The engine should be cold.
    2. When turning the crankshaft, the valve heads will hit against the piston's top position. Do not turn it more than necessary.

  1. Using a 10 mm hexagon wrench, install the timing belt idler pulley and new washer with the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. Check that the idler pulley moves smoothly.
    If it does not move smoothly, check the idler sub-assembly and washer.

  1. Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.



    A070548E01
  1. Place the tensioner upright. Then set the press to the top of the tensioner.

    NOTICE:
    1. Do not scratch or deform the rod end.
    2. Press in the tensioner rod upward.
    3. Protect the tip of the push rod with a cloth in order to prevent damage.

  1. Using a press, slowly push in the push rod using 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force.

    NOTICE:
    Do not impose a load of over 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) to the push rod.

  1. Align the holes of the push rod and housing. Then pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.

  1. Install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts and install the tensioner.



    A059983E01
  1. Remove the 1.5 mm hexagon wrench from the tensioner.



    A070549E02
  1. Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.



7. INSTALL NO. 1 TIMING BELT COVER
  1. Install the timing belt cover with the 6 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Install the wire harness clamp.

  1. Install the water hose clamp with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



8. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


A060179E02
  1. Remove any old seal packing (FIPG) material from the cylinder head.

  1. Apply seal packing to the specific areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the belt cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the seal packing.



    G034877E01
  1. Install the gasket and cylinder head cover with the 10 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



9. INSTALL VENTILATION PIPE


    A151170
  1. Connect the ventilation pipe to the cylinder herd cover.

  1. Install the ventilation pipe with the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



10. INSTALL NO. 4 INJECTION PIPE

NOTICE:
  1. When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
  2. Keep the joints of the injection pipe clean.



    A152275
  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    1. If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection clamp with a new one.
    2. Make sure that the inner-rubbers of the injection pipe fit inside the clamp.
    3. When installing the pipe, check that the inner rubbers and the clamp are in their proper positions.



    A152280E02
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Using a union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).



11. INSTALL EGR COOLER WITH ELECTRIC EGR CONTROL VALVE AND NO. 2 EGR VALVE
  1. Install the EGR cooler (Click here).



12. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


A097638E01
  1. Install the tensioner with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Firmly press and hold the tensioner against the cylinder block to eliminate any gaps in the areas labeled A in the illustration. Then uniformly tighten the 4 bolts.



13. INSTALL GENERATOR ASSEMBLY


A111821E01
  1. Install the generator with the 2 bolts.

    Torque:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf } for bolt A
    25 N*m{ 255 kgf*cm , 18 ft.*lbf } for bolt B

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 1001 kgf*cm , 87 in.*lbf }

  1. Connect the generator connector.



14. INSTALL COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System)


I043253E02
  1. Install the compressor with the 4 bolts and tighten the bolts in the order shown in the illustration.

    Torque:
    24.5 N*m{ 250 kgf*cm , 18 ft.*lbf }

  1. Connect the connector.



15. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (for Cold Area Specification Vehicles)
  1. Install the bracket with the 2 bolts.

    Torque:
    47 N*m{ 479 kgf*cm , 35 ft.*lbf }



16. INSTALL VISCOUS WITH MAGNET CLUTCH HEATER ASSEMBLY (for Cold Area Specification Vehicles)


    I034100E02
  1. Install the viscous with magnet clutch heater with the 2 bolt.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }

  1. Connect the connect.



17. INSTALL FAN SHROUD
  1. Install the fan pulley to the water pump.

  1. Install the shroud together with the coupling fan between the radiator and engine component.

    NOTICE:
    Be careful not to damage the radiator core.

  1. Install the fluid coupling fan to the fan pulley with the 4 nuts.
    Tighten the nuts as much as possible by hand.



    A151121
  1. Attach the shroud's claws to the radiator.

  1. Install the shroud with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the drive belt .

  1. Tighten the 4 nuts of the fluid coupling fan.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



    A151120
  1. Install the radiator reservoir with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the No. 1 and No. 2 water by-pass hoses to the tank upper and lower.



    A151119
  1. Install the oil reservoir with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



18. CONNECT RADIATOR HOSE INLET


19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


20. ADD ENGINE COOLANT
  1. Tighten the radiator drain cock plug by hand.

  1. Tighten the cylinder block drain cock plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



    A098989E01
  1. Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.

    Standard capacity:
    9.8 liters (10.4 US qts, 8.6 Imp. qts)

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level drops below the B line, add TOYOTA SLLC to the B line.

  1. Install the radiator reservoir cap.



    A099591E01
  1. Using a wrench, install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Bleed air from the cooling system.

    1. Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.

      HINT:
      The thermostat open timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

    2. Maintain the engine speed at 2500 to 3000 rpm.

    3. Press the inlet and outlet radiator hoses several times by hand to bleed air.

      CAUTION:
      When pressing the radiator hoses:
      1. Wear protective gloves.
      2. Be careful as the radiator hoses are hot.
      3. Keep your hands away from the radiator fan.

    4. Stop the engine and wait until the coolant cools down to ambient temperature.

      CAUTION:
      Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    G036768E01
  1. After the coolant cools down, check that the coolant level is at the F line.
    If the coolant level is below the F line, add TOYOTA SLLC to the F line.



21. INSPECT FOR COOLANT LEAK

NOTICE:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A097645E01
  1. Fill the radiator with coolant and attach a radiator cap tester to the radiator reservoir.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2 ,17.1 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks.
    If no external leaks are found, check the cylinder block and head.



22. INSPECT FOR OIL LEAK


23. INSTALL NO. 1 ENGINE UNDER COVER (for 4WD)
  1. Install the under cover with the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



24. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.