Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING PANEL (for Automatic Air Conditioning System)

AIR CONDITIONING PANEL (for Automatic Air Conditioning System) > INSTALLATION

for Preparation Click here



1. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY


E117035
  1. Connect all the connectors.

  1. Attach the 6 claws and 4 clips to install the panel.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).