Home › DRIVE LINE › PROPELLER SHAFT › FRONT PROPELLER SHAFT ASSEMBLY (for TMT Made)

FRONT PROPELLER SHAFT ASSEMBLY (for TMT Made) > INSPECTION

for Preparation Click here



1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY


C029928E01
  1. Using a dial indicator, measure the propeller shaft runout.

    Maximum runout:
    0.3 mm (0.0120 in.)

    If the shaft runout is greater than the maximum, replace the propeller shaft.



2. INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY
  1. Check the spider bearings for wear or damage.

  1. Check each spider bearing's axial play by turning the yoke while holding the shaft tightly.

    Maximum bearing axial play:
    0.05 mm (0.0020 in.)

    If the bearing axial play is greater than the maximum, replace the spider bearing.