FRONT PROPELLER SHAFT ASSEMBLY (for TSAM Made) > INSPECTION |
| 1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY |
![]() |
Using a dial indicator, measure the propeller shaft runout.
| 2. INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY |
Check the spider bearings for wear or damage.
Check each spider bearing's axial play by turning the yoke while holding the shaft tightly.