Home › ENGINE ยท 2KD-FTV › EMISSION CONTROL › VACUUM SWITCHING VALVE (w/ EGR Cooler)

VACUUM SWITCHING VALVE (w/ EGR Cooler) > INSTALLATION

for Preparation Click here



1. INSTALL NO. 2 VACUUM SWITCHING VALVE (for No. 2 EGR)


    A151159
  1. Install the No. 2 VSV to the manifold stay with the screw.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }



2. INSTALL NO. 1 VACUUM SWITCHING VALVE (for EGR Cut)


    A147229
  1. Install the No. 1 VSV to the manifold stay with the screw.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }



3. CONNECT NO. 3 VACUUM TRANSMITTING HOSE
  1. Connect the vacuum hose to the VSV (for No. 2 EGR valve) shown in the illustration below.



4. CONNECT NO. 1 VACUUM TRANSMITTING HOSE
  1. Connect the vacuum hose to the VSV (for E-VRV) shown in the illustration below.



5. CONNECT NO. 2 VACUUM TRANSMITTING HOSE


  1. Connect the vacuum hose to the VSV (for electric EGR control valve) shown in the illustration below.


    A148630E01



6. INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE


    A148631E01
  1. Install the manifold stay with VSV with the 2 bolts, and connect the No. 1 vacuum transmitting hose (color is "Blue") to the No. 2 vacuum transmitting pipe.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

    NOTICE:
    Install the vacuum hoses' color matches the connection areas' color.



    A148632E01
  1. Connect the 3 vacuum hoses.

    NOTICE:
    1. Install the vacuum hoses' color matches the connection areas' color.
    2. Make sure the vacuum hoses' color matches the connection areas' color.



    A147226
  1. Connect the 2 connectors.



7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


8. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.