Home › DRIVE LINE › PROPELLER SHAFT › FRONT PROPELLER SHAFT ASSEMBLY (for TMT Made)

FRONT PROPELLER SHAFT ASSEMBLY (for TMT Made) > INSTALLATION

for Preparation Click here



1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY


C098709E01
  1. Align the matchmarks on the propeller shaft flange and transfer flange.

  1. Install the propeller shaft with the 4 nuts and 4 washers.

    Torque:
    88 N*m{ 897 kgf*cm , 65 ft.*lbf }



    C098708E01
  1. Align the matchmarks on the propeller shaft flange and differential flange.

  1. Connect the propeller shaft with the 4 bolts, 4 nuts and 4 washers.

    Torque:
    88 N*m{ 897 kgf*cm , 65 ft.*lbf }