Home › ENGINE ยท 1KD-FTV › ENGINE MECHANICAL › ENGINE UNIT

ENGINE UNIT > REASSEMBLY

for Preparation Click here


NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.



1. INSTALL TIGHT PLUG


    A058129E03
  1. Apply adhesive to the end of a new tight plug.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    NOTICE:
    Do not start the engine for 1 hour after the installation.

  1. Position A:
    Using a 14 mm steel bar and hammer, tap in the tight plug as shown in the illustration.



  1. Other Positions:
    Using SST and a hammer, tap in a new tight plug as shown in the illustration.
    Position B

    SST
    09950-60010   (09951-00180)
    09950-70010   (09951-07100)
    Position C
    SST
    09950-60010   (09951-00190)
    09950-70010   (09951-07100)
    Position D
    SST
    09950-60010   (09951-00200)
    09950-70010   (09951-07100)
    Position E
    SST
    09950-60010   (09951-00350)
    09950-70010   (09951-07100)
    Position F
    SST
    09950-60010   (09951-00400, 09951-00450)
    09950-70010   (09951-07100)
    Position G
    SST
    09950-60010   (09951-00450)
    09950-70010   (09951-07100)


    A152216E01



2. INSTALL STUD BOLT



A152217E01



3. INSTALL STRAIGHT PIN



A152218E01



4. INSTALL RING PIN



A152219E01



5. INSTALL NO. 1 STRAIGHT SCREW PLUG
  1. Install a new gasket and the screw plug.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }



6. INSTALL NO. 1 OIL NOZZLE SUB-ASSEMBLY


A060268E01
  1. Align the pin of the oil nozzle with the pin hole of the cylinder block.

  1. Install the 4 oil nozzles together with the check valves.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }



7. INSTALL PISTON PIN


  1. Assemble the piston and connecting rod.



      A060203E01
    1. Using a small screwdriver, install a new snap ring on one side of the piston pin hole.



    2. A060230E01
    3. Gradually heat the piston to about 80°C (176°F).



    4. A149783E01
    5. Coat the piston pin with engine oil.

    6. Align the front marks of the piston and connecting rod, and push in the piston pin with your thumb.



    7. A060232E01
    8. Check the fit between the piston and piston pin. Try to move the piston back and forth on the piston pin.



    9. A149753
    10. Using a small screwdriver, install a new snap ring on the other side of the piston pin hole.



    A154173E01
  1. Install the piston rings.

    1. Install the coil and oil ring by hand.

      HINT:
      Face the end gap of the oil ring in the opposite direction of the coil joint.



    2. A149787E01
    3. Using a piston ring expander, install the No. 1 and No. 2 piston rings with the code mark facing upward.

      Code mark:
      Number

      Mark
      No. 1
      w/ EGR cooler
      NPR
      w/o EGR cooler
      NKD
      No. 2
      N



    4. A149789E01
    5. Position the piston rings so that the ring ends are as shown.

      NOTICE:
      Do not align the ring ends.



8. INSTALL CONNECTING ROD BEARING


A060205E01
  1. Align the bearing claw with the groove of the connecting rod or connecting cap.

  1. Install the bearings to the connecting rod and connecting rod cap.



9. INSTALL CRANKSHAFT BEARING


A060228E01

HINT:
Upper bearings have an oil groove and oil hole. Lower bearings do not.

  1. Align the bearing claw with the claw groove of the cylinder block, and push in the 5 upper bearings.

  1. Align the bearing claw with the claw groove of the crankshaft bearing cap, and push in the 5 lower bearings.



10. INSTALL CRANKSHAFT


A060188E02
  1. Place the crankshaft on the cylinder block.

  1. Install the 2 upper thrust washers to the No. 5 journal position of the cylinder block.

    1. Push the crankshaft toward the front (rear) side.

    2. Install the 2 thrust washers with the oil grooves facing outward.



    A060189E03
  1. Install the 2 thrust washers on the No. 5 bearing cap with the grooves facing outward.



    A060226E01
  1. Install the 5 crankshaft bearing caps in their proper locations.



    A060270E02
  1. Install the crankshaft bearing cap bolts.

    HINT:
    1. The main bearing cap bolts are tightened in 2 progressive steps.
    2. If a main bearing cap bolt is broken or deformed, replace it.


    1. Apply a light coat of engine oil to the threads and under the bolt heads of the main bearing caps.

    2. Install and uniformly tighten the 10 bolts of the main bearing caps in several passes in the sequence shown in the illustration.

      Torque:
      50 N*m{ 510 kgf*cm , 37 ft.*lbf }

      If any one of the bearing cap bolts does not meet the torque specification, replace the bearing cap bolt.



    3. A060271E06
    4. Mark the front of the main bearing cap bolts with paint.

    5. Retighten the main bearing cap bolts 90° in the numerical order shown above.

    6. Check that the painted marks are now at a 90° angle to the front.

  1. Check that the crankshaft turns smoothly.

  1. Check the crankshaft thrust clearance.



11. INSTALL PISTON AND CONNECTING ROD


A149791E01
  1. Using a piston ring compressor, push the correctly numbered piston and connecting rod assembly into the cylinder with the front mark of the piston facing forward.



    A060237E01
  1. Place the connecting rod cap on the connecting rod.

    1. Match the numbered connecting rod cap with the connecting rod.

    2. Align the pins of the connecting rod cap with the pin holes of the connecting rod, and install the connecting rod cap.



    3. A060238E01
    4. Check that the front mark of the connecting rod cap is facing forward.



    A060235E01
  1. Install the connecting rod cap bolts.

    HINT:
    1. The connecting rod cap bolts are tightened in 2 progressive steps.
    2. If any connecting rod bolt is broken or deformed, replace it.


    1. Apply a light of engine oil on the threads and under the heads of the connecting rod cap bolts.

    2. Install and alternately tighten the bolts of the connecting rod cap in several passes.

      Torque:
      35 N*m{ 357 kgf*cm , 26 ft.*lbf }

      If any one of the connecting rod cap bolts does not meet the torque specification, replace the cap bolts.



    3. A060197E02
    4. Mark the front of the connecting rod cap bolts with paint.

    5. Retighten the connecting rod cap bolts 90° as shown.

    6. Check that the painted marks are now at a 90° angle to the front.

  1. Check that the crankshaft turns smoothly.

  1. Check the connecting rod thrust clearance .



12. INSTALL CYLINDER BLOCK OIL ORIFICE


13. INSTALL SUPPLY PUMP GEAR BEARING


A058122E01
  1. Using SST and a press, press in a new bearing.

    SST
    09223-00010  
    09223-15020  
    09502-12010  
    09950-70010   (09951-07100)



14. INSTALL ENGINE REAR OIL SEAL RETAINER


A156389E01
  1. Remove any old packing (FIPG) material.

  1. Apply seal packing to the specific places described in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    3 to 5 mm (0.12 to 0.20 in.)

    NOTICE:
    After applying FIPG, install the engine rear oil seal retainer within 3 minutes and tighten its bolts within 15 minutes.



    A156390
  1. Install the retainer with the 5 bolts. Alternately tighten the 5 bolts in several passes.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



15. INSTALL NO. 2 BALANCE SHAFT DRIVEN GEAR


A051335E01
  1. Mount the balance shaft between aluminum plates in a vise.

    NOTICE:
    Be careful not to damage the balance shaft.

  1. Align the balance shaft knock pin with the knock pin hole. Then install the balance shaft thrust washer and balance shaft driven gear.

  1. Install the bolt.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



16. INSTALL NO. 2 BALANCE SHAFT SUB-ASSEMBLY


A051334E01
  1. Install the balance shaft with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



17. INSTALL NO. 1 BALANCE SHAFT DRIVEN GEAR


A051333E01
  1. Mount the balance shaft between aluminum plates in a vise.

    NOTICE:
    Be careful not to damage the balance shaft.

  1. Align the balance shaft knock pin with the knock pin hole. Then install the balance shaft thrust washer and balance shaft driven gear.

  1. Install the bolt.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



18. INSTALL NO. 1 BALANCE SHAFT SUB-ASSEMBLY


A051332E01
  1. Install the balance shaft with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



19. INSTALL TIMING GEAR CASE ASSEMBLY
  1. Remove any old packing (FIPG) material.



    A075511E02
  1. Apply seal packing to the timing gear case as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    5 mm (0.20 in.)

    NOTICE:
    Install the timing gear case within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.



    A060151E01
  1. Install a new gasket to the groove of the timing gear case.



    A069840E01
  1. Install 2 new O-rings to the cylinder block groove of the timing gear case.



    A069841E01
  1. Align the "2" marks of the balance shaft driven gear No. 1 and oil pump drive gear.

  1. Align the mark on the oil pump drive gear with the mark on the timing gear case.



    A069842E02
  1. Install the timing gear case with the union bolt and 8 bolts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf } for union bolt (A)
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt



    A060154E01
  1. Remove the screw plug.

  1. Pour in approximately 20 cc (0.12 cu in.) of engine oil into the oil pump.

  1. Install a new gasket and the screw plug.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }



20. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



21. INSTALL OIL PAN SUB-ASSEMBLY


A151187E01
  1. Remove any old packing (FIPG) material.

  1. Apply seal packing to the oil pan as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.16 in.)

    NOTICE:
    Install the oil pan within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.

  1. Install the oil pan with the 22 bolts and 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the oil level gauge sensor with the 4 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



22. INSTALL CRANKSHAFT TIMING GEAR OR SPROCKET


A061827E01
  1. Face the crankshaft timing gear with timing mark 1 facing forward.

  1. Align the set key on the crankshaft with the key groove of the crankshaft timing gear.

  1. Using SST and a hammer, tap in the timing gear.

    SST
    09223-00010  



23. INSTALL SUPPLY PUMP GEAR
  1. Install the supply pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A069843E01
  1. Align the "3" marks of the balance shaft driven gear No. 2 and supply pump gear.



    A069844E01
  1. Install a new O-ring to the supply pump gear.



    A069845E01
  1. Install the supply pump gear set nut.

  1. Using SST, tighten the nut.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    64 N*m{ 650 kgf*cm , 47 ft.*lbf }



24. INSTALL NO. 2 IDLE SUB GEAR


A069847E01
  1. Mount the No.1 idle gear in a vise.

    HINT:
    The cut-off mark of the idle gear faces down.

    NOTICE:
    Be careful not to damage the gear.



    A069848E01
  1. Install the idle gear spring.

  1. Install the No. 2 idle sub-gear.

  1. Install the wave washer.

    HINT:
    Fit the pins on the gears to the spring ends.



    A069834E01
  1. Using snap ring pliers, install the snap ring.



    A069850E01
  1. Using SST, align the holes of the No. 1 idle gear and No. 2 idle sub gear by turning the No. 2 idle sub gear clockwise, and install a service bolt.

    SST
    09960-10010   (09962-01000, 09963-00700)

  1. Remove the No. 1 idle gear from the vise and turn it upside down.



25. INSTALL NO. 1 IDLE SUB GEAR


A069851E01
  1. Mount the No. 1 idle gear and No. 2 idle sub gear in a vise.

    NOTICE:
    Be careful not to damage the gears.



    A069852E01
  1. Remove the service bolt.



    A069853E01
  1. Install the idle gear spring.

  1. Install the No. 1 idle sub gear.

  1. Install the wave washer.

    HINT:
    Fit the pins on the gears to the spring ends.



    A069832E01
  1. Using a snap ring pliers, install the snap ring.



    A069854E01
  1. Using SST, align the holes of the No. 1 idler gear and No. 1 idle sub gear by turning the No. 1 idle sub gear clockwise, and install the service bolt.

    SST
    09960-10010   (09962-01000, 09963-00600)



26. INSTALL NO. 1 IDLE GEAR


A060159E01
  1. Install the gear shaft as shown in the illustration.



    G036757E01
  1. Align the "5" timing marks of the idle gear and crankshaft timing gear.

  1. Using SST, turn the supply pump gear, and align the "4" timing marks of the idle gear and supply pump gear, and mesh the gears.

    SST
    09960-10010   (09962-01000, 09963-01000)



    A060161E02
  1. Face the thrust plate with the protrusion facing forward.

  1. Align the bolt holes, and install the thrust plate with the 2 bolts.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

  1. Remove the service bolt.



27. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE


A060163E01
  1. Align the set key with the key groove of the sensor plate.

  1. Install the sensor plate, facing the cup side outward.



28. INSTALL TIMING GEAR CASE ASSEMBLY
  1. Remove any old packing (FIPG) material.



    A059934E01
  1. Apply seal packing to the timing gear cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    3 to 5 mm (0.12 to 0.20 in.)

    NOTICE:
    Install the timing gear case within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.



    A060162E01
  1. Install a new O-ring to the timing gear case.



    A060274E01
  1. Install the timing gear cover with the 14 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



29. INSTALL WATER PUMP ASSEMBLY


A225339
  1. Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



30. INSTALL CYLINDER HEAD SUB-ASSEMBLY


A060284E01

HINT:
  1. The cylinder head bolts are tightened in 3 progressive steps.
  2. If any bolt is broken or deformed, replace it.

  1. Apply a light coat of engine oil on the threads and under the heads of the cylinder head bolts.

  1. Install and uniformly tighten the 18 cylinder head bolts, in several passes in the sequence shown in the illustration.

    Torque:
    85 N*m{ 867 kgf*cm , 63 ft.*lbf }

    Bolt length A:
    110 mm (4.33 in.)

    Bolt length B:
    167 mm (6.57 in.)

    If any of the cylinder head bolts does not meet the torque specification, replace it.



    A060141E02
  1. Mark the front of the cylinder head bolts with paint.

  1. Further tighten the cylinder head bolts by 90° in the sequence shown in the illustration above.

  1. Finally, tighten the cylinder head bolts by an additional 90°.

  1. Check that the painted marks are now facing rearward.



31. INSTALL CAMSHAFT


G036616E01
  1. Using the crankshaft pulley bolt, set the No. 1 cylinder to 90° BTDC/compression.

    HINT:
    Set the No. 1 cylinder to 90° BTDC/compression to avoid interference with the piston top and valve head.



    A060149E01
  1. Install the camshaft.

    1. Apply MP grease to the thrust portion of the camshaft.

    2. Place the camshaft on the cylinder head, facing the key groove upward.



    3. A060150E01
    4. Align the timing marks (1 dot mark) of the camshaft drive and driven main gears, and set the No. 2 camshaft in place.



    A060283E02
  1. Remove any old packing (FIPG) material from the camshaft bearing cap.



  1. Apply seal packing to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.16 in.)

    NOTICE:
    1. Do not allow FIPG to contact the oil passage of the bearing cap.
    2. After applying FIPG, install the camshaft bearing caps within 3 minutes and fasten the bolts within 15 minutes.
    3. Do not start the engine for at least 2 hours after the installation.




      A060146E01
    1. Install the 5 bearing caps in their proper locations.



    2. A060147E02
    3. Apply a light coat of engine oil on the threads and under the heads of the bearing cap bolts.

    4. Install and uniformly tighten the 15 bearing cap bolts in several passes in the sequence shown in the illustration.

      Torque:
      19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Install the camshaft oil seal.



32. INSPECT VALVE CLEARANCE


A060176E02
  1. Check only the valves indicated.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Standard valve clearance (Cold):
      Intake
      Exhaust
      0.20 to 0.30 mm (0.008 to 0.012 in.)
      0.35 to 0.45 mm (0.014 to 0.018 in.)

      Write down valve clearance measurements that are out of the specified range. These measurements will be used later to determine the size of the adjustment shim to be installed.

  1. Turn the crankshaft 360° to set the No. 4 cylinder to TDC / compression.



    A060175E02
  1. Check only the valves indicated.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Standard valve clearance:
      Intake
      Exhaust
      0.20 to 0.30 mm (0.008 to 0.012 in.)
      0.35 to 0.45 mm (0.014 to 0.018 in.)

      Write down valve clearance measurements that are out of the specified range. These measurements will be used later to determine the size of the adjustment shim to be installed.



33. ADJUST VALVE CLEARANCE
  1. Adjust the valve clearance .



34. INSTALL INJECTOR ASSEMBLY


B008252E01

NOTICE:
Be sure to install the injector, holder clamp, washer and bolt in their original positions.

  1. Install 4 new injection nozzle sheets to the cylinder head.

  1. Apply a light amount of clean engine oil to 4 new O-rings.



    G036760E02
  1. Install the O-ring to each injector as shown in the illustration.

  1. Insert the 4 injectors into the cylinder head.

    NOTICE:
    1. At this time, insert the injector until it touches the nozzle sheet surface.
    2. After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
    3. Always return an injector to the same place it was removed from.

  1. Register injector compensation code (when replacing with a new injector).



    A060177E02
  1. Temporarily install 4 new washers and the 4 nozzle clamps with the 4 clamp bolts.

    HINT:
    Apply a light amount of engine oil to the threads and under the heads of the clamp bolts.

    NOTICE:

    1. G037744E01
    2. The fork portion of the nozzle holder clamp must be set to the injector.
    3. Before tightening the bolts, check that the nozzle holder clamp is set properly.
    4. To fasten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque at following step.
    5. When tightening the bolts, pay attention not to tilt the bolt and the clamp.
    6. Do not reuse the washer.
    7. If the nozzle leakage pipe is accidentally tightened beyond the torque specification, it must be replaced.

  1. Temporarily install the 4 injection pipes with the union nuts.

    HINT:
    To position the injectors, loosely tighten the union nut.



    A062123E01
  1. Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
    If scratches or dents are present, replace the nozzle leakage pipe.



    A070538E01
  1. Set the leakage pipe and 5 new gaskets in place.

  1. Apply a light amount of oil to the 4 hollow screws and union bolt.



    A060184E01
  1. Temporarily install the leakage pipe with the 4 hollow screws and union bolt.

  1. Tighten the 4 holder clamp bolts.

    Torque:
    22 N*m{ 224 kgf*cm , 16 ft.*lbf }



    A051297E01
  1. Tighten the 4 hollow screws in order from 1 to 4.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    If a hollow screw is accidentally tightened beyond the torque specification, it must be replaced.

  1. Tighten the union bolt.

    Torque:
    12.5 N*m{ 127 kgf*cm , 9 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.

  1. Remove the 4 injection pipes.



35. CHECK FOR FUEL LEAKS


G036759E01


  1. Check that there are no leaks from the nozzle leakage pipe connection.

    1. Install the gasket and No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).

      Part No.:
      23762-27010 (No. 2 nozzle leakage pipe)

      SST
      09280-00010  

      Torque:
      21 N*m{ 214 kgf*cm , 16 ft.*lbf }

    2. Apply a light amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.



    3. A060186E02
    4. Install SST (turbocharger pressure gauge) to the fuel return side of the leakage pipe, and maintain 100 kPa (1.0 kgf/cm2, 14.5 psi) of pressure for 60 seconds to check that no bubbles form.

      SST
      09992-00242  

      NOTICE:
      Before checking the leakage, be sure to remove the ball and spring in the check valve.

    5. After checking for fuel leaks, wipe off the soapy water from the leakage pipe connection.

    6. Remove SST, No. 2 nozzle leakage pipe and gasket.

      SST
      09280-00010  
      09992-00242  

      HINT:
      Never reinstall the disassembled check valve on the engine.



36. INSTALL CYLINDER BLOCK INSULATOR (w/ EGR Cooler)


    A149941
  1. Install the block insulator to the head.



37. INSTALL NO. 2 TIMING BELT COVER


    A060279E01
  1. Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    After applying FIPG, install the No. 2 timing belt cover within 3 minutes and tighten its bolts and nut within 15 minutes.

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



38. INSTALL CAMSHAFT TIMING PULLEY


    A060182E01
  1. Install the camshaft timing pulley.

  1. Fasten the bolt of the camshaft timing pulley by holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1,000 kgf*cm , 72 ft.*lbf }



39. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


A060179E02
  1. Remove any old seal packing (FIPG) material from the cylinder head.

  1. Apply seal packing to the specific areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the belt cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the seal packing.



    G034877E01
  1. Install the gasket and cylinder head cover with the 10 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



40. INSTALL NOZZLE HOLDER SEAL
  1. Install 4 new nozzle holder seals.



41. INSTALL OIL FILLER CAP SUB-ASSEMBLY