Home › DRIVE LINE › PROPELLER SHAFT › REAR PROPELLER SHAFT ASSEMBLY (for TMT Made)

REAR PROPELLER SHAFT ASSEMBLY (for TMT Made) > INSPECTION

for Preparation Click here



1. INSPECT PROPELLER SHAFT AND INTERMEDIATE SHAFT


C061260E02
  1. Using a dial indicator, measure the propeller shaft and intermediate shaft runout.

    Maximum runout:
    Item
    Specified Condition
    Propeller shaft
    0.3 mm (0.012 in.)
    Intermediate shaft
    0.5 mm (0.02 in.)

    If the shaft runout is greater than the maximum, replace the shaft.



2. INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY
  1. Check the spider bearings for wear or damage.

  1. Check each spider bearing's axial play by turning the yoke while holding the shaft tightly.

    Maximum bearing axial play:
    0 to 0.05 mm (0 to 0.002 in.)

    If the bearing axial play is greater than the maximum, replace the spider bearing.



3. INSPECT CENTER NO. 1 SUPPORT BEARING ASSEMBLY


F049879E01
  1. When turning the center bearing with your hand, check that it turns smoothly without catching, and that there are no cracks or damage.
    If there are any defects, replace it.
    If there is any damage to the lip of the center bearing case, replace it.