Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › HEATER SWITCH

HEATER SWITCH > INSPECTION

for Preparation Click here



1. INSPECT HEATER SWITCH ASSEMBLY


E178424E01
  1. Inspect the heater switch.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Switch Condition
      Specified Condition
      4(SW) - 1(E)
      ON
      Below 1 Ω
      4(SW) - 1(E)
      OFF
      10 kΩ or higher

      If the result is not as specified, replace the heater switch assembly.

  1. Inspect the switch illumination.

    1. Apply battery voltage between the terminals of the light, and check the operation of the light.

      OK:
      Measurement Condition
      Specified Condition
      Battery positive (+) → Terminal - 3(ILL+)
      Battery negative (-) → Terminal - 6(ILL-)
      Light comes on

      If the result is not as specified, replace the bulb or heater switch assembly.

  1. Inspect the switch indicator illumination.

    1. Apply battery voltage between the terminals of the light, and check the operation of the light.

      OK:
      Measurement Condition
      Specified Condition
      Battery positive (+) → Terminal 5(IND+)
      Battery negative (-) → Terminal 8(IND-)
      Light comes on

      If the result is not as specified, replace the bulb or heater switch assembly.