Home › ENGINE ยท 2TR-FE › STARTING › STARTER

STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    G039103E03
  1. Install the starter with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Install the starter wire to terminal 30 with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Attach the terminal cap.

  1. Connect the starter connector.



2. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission)


G034223E01
  1. Connect the release cylinder with the 2 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }



3. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY (for Automatic Transmission)
  1. Coat a new O-ring with ATF and install it to the transmission oil filler tube.

  1. Install the transmission oil filler tube with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the transmission oil level dipstick.



4. INSTALL FRONT FENDER SEAL
  1. Install the seal with the 5 clips.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).