Home › STEERING › POWER STEERING › VANE PUMP (for 5L-E)

VANE PUMP (for 5L-E) > INSTALLATION

for Preparation Click here



1. INSTALL VANE PUMP ASSEMBLY


    C123346E01
  1. Install the vane pump with the 2 bolts and nut.

    Torque:
    48 N*m{ 490 kgf*cm , 35 ft.*lbf } for bolt A
    63 N*m{ 642 kgf*cm , 47 ft.*lbf } for nut C

    HINT:
    Turn nut (C) while holding bolt (B).



2. INSTALL VANE PUMP PULLEY


    C123345E02
  1. Using SST, install the vane pump pulley to the vane pump.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    43 N*m{ 439 kgf*cm , 32 ft.*lbf }



3. CONNECT PRESSURE FEED TUBE ASSEMBLY
  1. Install a new gasket to the pressure feed tube.



    C123344
  1. Connect the pressure feed tube to the vane pump with the union bolt.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

    HINT:
    Make sure the stopper of the pressure feed tube touches the vane pump.



4. CONNECT OIL RESERVOIR TO NO. 1 PUMP HOSE


    C123343
  1. Connect the hose to the vane pump with the clip.



5. INSTALL FAN & GENERATOR V BELT (w/o Air Conditioning System)


    A115632E01
  1. Install the V belt.

  1. Tightening bolt C, adjust the deflection of the V belt .

  1. Tighten the bolts A and B.

    Torque:
    75 N*m{ 765 kgf*cm , 55 ft.*lbf } for bolt A
    18 N*m{ 185 kgf*cm , 13 ft.*lbf } for bolt B

  1. Recheck the deflection of the V belt.



6. INSTALL FAN & GENERATOR V BELT (w/ Air Conditioning System)


    A115632E01
  1. Install the V belt.

  1. Tightening bolt C, adjust the deflection of the V belt .

  1. Tighten the bolts A and B.

    Torque:
    75 N*m{ 765 kgf*cm , 55 ft.*lbf } for bolt A
    18 N*m{ 185 kgf*cm , 13 ft.*lbf } for bolt B

  1. Recheck the deflection of the V belt.



7. ADD POWER STEERING FLUID


8. BLEED AIR FROM POWER STEERING FLUID
(Click here)


9. CHECK POWER STEERING FLUID LEVEL IN RESERVOIR


10. CHECK FOR POWER STEERING FLUID LEAKS