FLOOR SHIFT ASSEMBLY > INSTALLATION |
| 1. INSTALL FLOOR SHIFT ASSEMBLY |
![]() |
Install the floor shift with the 4 bolts.
![]() |
Connect the clamp and 2 connectors.
Move the shift lever to L.
Connect the transmission control cable.
| 2. ADJUST SHIFT LEVER POSITION |
| 3. INSPECT SHIFT LEVER POSITION |
| 4. INSTALL CONSOLE BOX ASSEMBLY |
![]() |
Install the console box with the 4 screws and 2 bolts.
Install the 2 clips.
| *1 | Screw |
| *2 | Bolt |
| *3 | Clip |
| 5. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY |
for Manual Transmission:
Attach the 12 claws to install the upper console panel.

| *A | for 2WD | *B | for 4WD |
for Automatic Transmission:
Attach the 12 claws to install the upper console panel.

| *A | for 2WD | *B | for 4WD |
| 6. INSTALL PARKING BRAKE HOLE COVER SUB-ASSEMBLY |
Attach the 4 claws to install the parking brake hole cover.
| 7. INSTALL TRANSFER SHIFT LEVER KNOB SUB-ASSEMBLY |