PRESSURE SWITCH > ON-VEHICLE INSPECTION |
| 1. INSPECT PRESSURE SWITCH |
![]() |
Connect the manifold gauge set.
Connect the positive (+) lead from an ohmmeter to terminal 1 and the negative (-) lead to terminal 2.
Check the resistance between terminals when refrigerant pressure is charged, as shown in the illustration. If the operation is not as specified, replace the pressure switch.