PRE-HEATING SYSTEM > ON-VEHICLE INSPECTION |
| 1. INSPECT ILLUMINATION DURATION OF GLOW INDICATOR LIGHT |
Inspect the light illumination duration.
Turn the ignition switch to ON, and then measure the light illumination duration.

| *a | Light Illumination Duration | *b | Engine Coolant Temperature |
Turn the ignition switch off.
| 2. INSPECT PRE-HEATING |
![]() |
Inspect the pre-heating time.
| *a | Pre-heating Time |
| *b | Battery Voltage |
Turn the ignition switch to ON. Measure how long it takes for battery voltage to be applied to the glow plugs.
| Engine Coolant Temperature | Pre-heating Time |
| 40°C (104°F) or higher | 1 second |
| below 40°C (104°F) | Refer to the graph (maximum: 15 seconds) |
Turn the ignition switch off.
Turn the ignition switch to START. Check that battery voltage is applied to the glow plugs.
While cranking the engine, measure how long it takes for battery voltage to be applied to the glow plugs.
| Engine Coolant Temperature | Pre-heating Time |
| 40°C (104°F) or higher | 1 second |
| below 40°C (104°F) | Refer to the graph (maximum: 15 seconds) |
| 3. INSPECT AFTER GLOW TIME |
Inspect the afterglow time.
After the engine starts, measure how long it takes for battery voltage to be applied to terminals E4-15 (GREL) and E6-7 (E1) of the ECM.
| Tester Connection | Specified Condition |
| E4-15 (GREL) - E6-7 (E1) | Refer to the graph |

| *a | Component with harness connected (ECM) | *b | After Glow Time |
| *c | Engine Coolant Temperature | - | - |