CYLINDER HEAD > REPLACEMENT |
| 1. REPLACE INTAKE VALVE GUIDE BUSH |
![]() |
Gradually heat the cylinder head to approximately 80 to 100°C (176 to 212°F).
![]() |
Using SST and a hammer, tap out the valve guide bush.
![]() |
Using a caliper gauge, measure the bush bore diameter of the cylinder head.
| Bush Size | Bush Bore Diameter |
| Use STD | 10.985 to 11.006 mm (0.4325 to 0.4333 in.) |
| Use O/S 0.05 | 11.035 to 11.056 mm (0.4344 to 0.4353 in.) |
![]() |
Gradually heat the cylinder head to approximately 80 to 100°C (176 to 212°F).
Using SST and a hammer, tap in a new guide bush to the specified protrusion height.
![]() |
Using a sharp 6.0 mm reamer, ream the guide bush to obtain the standard specified clearance between the guide bush and valve stem.
| 2. REPLACE EXHAUST VALVE GUIDE BUSH |
![]() |
Gradually heat the cylinder head to approximately 80 to 100°C (176 to 212°F).
![]() |
Using SST and a hammer, tap out the valve guide bush.
![]() |
Using a caliper gauge, measure the bush bore diameter of the cylinder head.
| Bush Size | Bush Bore Diameter |
| Use STD | 10.985 to 11.006 mm (0.4325 to 0.4333 in.) |
| Use O/S 0.05 | 11.035 to 11.056 mm (0.4344 to 0.4353 in.) |
![]() |
Gradually heat the cylinder head to approximately 80 to 100°C (176 to 212°F).
Using SST and a hammer, tap in a new guide bush to the specified protrusion height.
![]() |
Using a sharp 6.0 mm reamer, ream the guide bush to obtain the standard specified clearance between the guide bush and valve stem.