Home › ENGINE ยท 5L-E › STARTING › PRE-HEATING SYSTEM

PRE-HEATING SYSTEM > ON-VEHICLE INSPECTION

for Preparation Click here



1. INSPECT LIGHTING TIME OF GLOW INDICATOR LIGHT


A112489E03

NOTICE:
Turn the ignition switch OFF for 60 seconds before performing this inspection.

  1. Turn the ignition switch to the ON position, and measure the lighting time.

    Lighting time:
    Refer to the graph



2. INSPECT PRE-HEATING


A112490E04

NOTICE:
Turn the ignition switch OFF for 60 seconds before performing this inspection.

  1. Turn the ignition switch to the ON position, and measure the time that the battery voltage is applied to the glow plugs.

    Standard pre-heating time :
    Engine Coolant Temperature Condition
    Specified Condition
    40°C (104°F) or more
    1 sec.
    40°C (104°F) or less
    Refer to the graph (15 sec. at the longest)

  1. Turn the ignition switch to the START position, and check that battery voltage is applied to the glow plugs.

  1. While cranking the engine, measure the time that the battery voltage is applied to the glow plugs.

    Standard pre-heating time:
    Engine Coolant Temperature Condition
    Specified Condition
    40°C (104°F) or more
    1 sec.
    40°C (104°F) or less
    Refer to the graph (15 sec. at the longest)



3. INSPECT AFTER GLOW TIME


NOTICE:
Turn the ignition switch OFF for 60 seconds before performing this inspection.



A122001E04

  1. After the engine starts, measure how long it takes for battery voltage to be applied to terminals E23-2 (SREL) and E20-14 (E1) of the ECM.

    Standard after glow time:
    Tester Connection
    Specified Condition
    E23-2 (SREL) - E20-14 (E1)
    See graph

    If the result is not as specified, inspect the ECM, ECT sensor, glow plug and GLOW relay.