VACUUM SWITCHING VALVE > INSTALLATION |
| 1. INSTALL PURGE VSV |
![]() |
Install the purge VSV with the bolt.
Connect the 2 purge line hoses.
Connect the purge VSV connector.
| 2. INSTALL V-BANK COVER |
Install the cover with the 2 nuts.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |