Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


A092670E03
  1. Apply adhesive to 2 or 3 threads of the valve.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



    A112001E01
  1. Install the valve.

    Torque:
    27 N*m{ 275 kgf*cm , 20 ft.*lbf }

  1. Connect the ventilation hose to the valve.

  1. Secure the hose with the clamp.



2. INSTALL INTAKE AIR SURGE TANK


A075648E03
  1. Install a new gasket and the surge tank with the 2 nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Using an 8 mm hexagon wrench, install the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



    A075647E01
  1. Install the 3 upper bolts which are used to secure the 2 surge tank stays and throttle body bracket.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }



    A075646E01
  1. Install the 3 wire harness clamps and hose clamp.

  1. Connect the throttle position sensor and control motor connector.

  1. Connect the purge VSV connector.

  1. Connect the VSV connector (for ACIS).



    A075645E01
  1. Connect the No. 1 ventilation hose.



    A075644E01
  1. Connect the purge line hose.



    A075598E01
  1. Connect the No. 4 water by-pass hose.



    A075597E01
  1. Connect the No. 5 water by-pass hose.



3. INSTALL V-BANK COVER
  1. Install the cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL