Home › ENGINE ยท 5L-E › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


    A122287
  1. Install the generator with the bolt.

    Torque:
    75 N*m{ 765 kgf*cm , 55 ft.*lbf }

  1. Connect the vacuum oil outlet hose.



    A118425
  1. Install 2 new gaskets and the vacuum pump hose with the union bolt.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Install the vacuum pump oil inlet hose with 2 new gaskets and the union bolt.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Attach the vacuum pump oil inlet hose to the cord clip.



    A118424
  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }

  1. Attach the terminal cap.

  1. Connect the generator connector.



2. INSTALL COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System)


    A121135E02
  1. Temporarily install the compressor mounting bracket with the 4 bolts.

  1. Using several steps, uniformly install and tighten the 4 bolts.

    Torque:
    85 N*m{ 865 kgf*cm , 63 ft.*lbf }



    A112016E01
  1. Temporarily tighten the bolt and spacer.



3. INSTALL COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System)


    A118422
  1. Install the compressor with the 4 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Connect the compressor connector.



4. INSTALL FAN BELT ADJUSTING BAR (w/o Air Conditioning System)


    A123775
  1. Install the fan belt adjusting bar with the 2 bolts.

    Torque:
    45 N*m{ 460 kgf*cm , 33 ft.*lbf }



    A123774
  1. Temporarily install the bolt.



5. INSTALL FAN & GENERATOR V BELT (w/o Air Conditioning System)


    A142830E01
  1. Install the V belt.

  1. Using a bar, adjust the tension of the V belt.

  1. Tighten the bolts A and B.

    Torque:
    75 N*m{ 765 kgf*cm , 55 ft.*lbf } for bolt A
    18 N*m{ 185 kgf*cm , 13 ft.*lbf } for bolt B

  1. Check the deflection of the V belt .



6. INSTALL FAN AND GENERATOR V BELT (w/ Air Conditioning System)


    A115632E01
  1. Install the V belt.

  1. Tightening bolt C, adjust the deflection of the V belt .

  1. Tighten the bolts A and B.

    Torque:
    75 N*m{ 765 kgf*cm , 55 ft.*lbf } for bolt A
    18 N*m{ 185 kgf*cm , 13 ft.*lbf } for bolt B

  1. Recheck the deflection of the V belt.



7. INSTALL COOLER COMPRESSOR V BELT (w/ Air Conditioning System)


    A121093E02
  1. Install the V belt.

  1. Tightening bolt B, adjust the deflection of the V belt .

  1. Tighten nut A.

    Torque:
    39 N*m{ 400 kgf*cm , 29 ft.*lbf }

  1. Recheck the deflection of the V belt.



8. INSTALL AIR CLEANER ASSEMBLY


    A118427
  1. Install the cleaner with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Connect the connector to the IAT sensor.

  1. Connect the hose clamp.



9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL