Home › ENGINE ยท 2TR-FE › ENGINE CONTROL SYSTEM › INTEGRATION RELAY

INTEGRATION RELAY > ON-VEHICLE INSPECTION

for Preparation Click here



1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag activation.



2. REMOVE ENGINE ROOM RELAY BLOCK COVER


3. CHECK INTEGRATION NO.1 RELAY


    G038997E01
  1. Using a screwdriver, detach the 2 claws and disconnect the integration relay from the engine room junction block.

    HINT:
    Tape the screwdriver tip before use.



    A112973E01
  1. Measure the voltage of the MAIN relay.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    1J-4 - Body ground
    Ignition switch ON
    10 to 14 V

    If the result is not as specified, replace the integration relay.



    A112973E01
  1. Measure the voltage of the C/OPN relay.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    1J-4 - Body ground
    Ignition switch ON
    10 to 14 V

    If the result is not as specified, replace the integration relay.



4. INSTALL ENGINE ROOM RELAY BLOCK COVER


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL