Home › ENGINE ยท 1KD-FTV › EMISSION CONTROL › VACUUM REGULATING VALVE

VACUUM REGULATING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VACUUM SWITCHING VALVE (for EGR CUT)
  1. Install the vacuum switching valve with the bolt.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }



2. INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (for EGR)
  1. Install the electric vacuum regulating valve together with the bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 3 vacuum hoses.

  1. Connect the 2 connectors.



3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


A111785
  1. Install the engine cover with the 3 bolts and 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }