ROOF DRIP SIDE FINISH MOULDING > INSTALLATION |
| 1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP |
| Item | Temperature |
| Vehicle Body | 40 to 60°C (104 to 140°F) |
| No. 1 Roof Drip Side Finish Moulding Clip | 20 to 30°C (68 to 86°F) |
![]() |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new No. 1 roof drip side finish moulding clips.
| *1 | Adhesive |
| *a | 2 to 3 mm Bead of Adhesive |
Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.
While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the clip after lightly pressing it so that the adhesive adheres to the primer.

| Area | Measurement (Reference Value) | Area | Measurement (Reference Value) |
| A | 29.1 mm (1.15 in.) | D | 30.4 mm (1.20 in.) |
| B | 5.5 to 6.0 mm (0.217 to 0.236 in.) | E | 5.4 to 5.9 mm (0.213 to 0.232 in.) |
| C | 6.0 mm (0.236 in.) | F | 6.7 mm (0.264 in.) |
| 2. INSTALL ROOF DRIP SIDE FINISH MOULDING LH |
Attach the 2 clips to install the roof drip side finish moulding.