Home › ENGINE · 5L-E › FUEL › FUEL INJECTION PUMP

FUEL INJECTION PUMP > ON-VEHICLE INSPECTION

for Preparation Click here



1. CHECK INJECTION PUMP


    B012956
  1. Inspect the engine speed sensor.

    1. Measure the resistance of the sensor.

      Standard resistance:
      Tester Connection
      Condition
      Specified Condition
      1 (NE-) - 2 (NE+)
      20°C (68°F)
      205 to 255 Ω

      If the result is not as specified, replace the speed sensor.



    B012767E01
  1. Inspect the spill control valve.

    1. Measure the resistance of the spill control valve.

      Standard resistance:
      Tester Connection
      Condition
      Specified Condition
      1 (SPV-) - 2 (SPV+)
      20°C (68°F)
      1 to 2 Ω

      If the result is not as specified, replace the injection pump.



2. CHECK TIMING CONTROL VALVE


    B012766E02
  1. Inspect the timing control valve.

    1. Measure the resistance of the timing control valve.

      Standard resistance:
      Tester Connection
      Condition
      Specified Condition
      1 (+B) - 2 (TCV)
      20°C (68°F)
      10 to 14 Ω

      If the result is not as specified, replace the timing control valve.

  1. Inspect the timing control valve operation.

    1. Connect the battery's positive (+) lead to the timing control terminal +B.

    2. Connect the battery's negative (-) lead to the timing control valve terminal TCV.

    3. Check that the solenoid makes a "click" sound.

      CAUTION:
      1. Do not apply voltage for more than 30 seconds to avoid burning out the timing control valve solenoid.
      2. When performing this step, wait until the solenoid coils become cool enough that the solenoid can be touched by hand.

      If the result is not as specified, replace the timing control valve.