Home › ENGINE ยท 2KD-FTV › EMISSION CONTROL › VACUUM SWITCHING VALVE

VACUUM SWITCHING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VACUUM SWITCHING VALVE (for EGR Cut)
  1. Install the vacuum switching valve to the manifold stay with the screw.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }



2. INSTALL VACUUM TRANSMITTING HOSE ASSEMBLY


    A211921E02
  1. Install the vacuum transmitting hose shown in the illustration.
    Text in Illustration 
    *1
    Yellow Paint



3. INSTALL NO. 2 VACUUM TRANSMITTING HOSE ASSEMBLY


    A211922E02
  1. Install the No. 2 vacuum transmitting hose to the vacuum switching valve shown in the illustration.
    Text in Illustration 
    *1
    Pink Paint



4. INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE


    A211862
  1. Install the manifold stay with vacuum switching valve with the 2 bolts and connect the vacuum transmitting hose.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

    NOTICE:
    Be sure to securely connect the vacuum transmitting hose.



    A211923E02
  1. Connect the 2 vacuum transmitting hoses.
    Text in Illustration 
    *1
    Yellow Paint
    *2
    Pink Paint

    NOTICE:
    1. Be sure to securely connect the vacuum transmitting hoses.
    2. Make sure the vacuum transmitting hoses' color matches the connection areas' color.

  1. Connect the vacuum switching valve connector.