FUEL INJECTOR > INSTALLATION |
| 1. INSTALL INJECTOR ASSEMBLY |
![]() |
Install 4 new injection nozzle seats to the cylinder head.
Apply a light amount of clean engine oil to 4 new O-rings.
![]() |
Install an O-ring to each injector as shown in the illustration.
| *1 | New O-Ring |
Insert the 4 injectors into the cylinder head.
For an injector that has been replaced with a new injector, register the injector compensation code .
![]() |
Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.
| *1 | Washer |
| *a | Downward |
![]() |
| *1 | No. 1 Nozzle Holder Clamp |
Temporarily install the 4 injection pipes with the union nuts.
![]() |
Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
If scratches or dents are present, replace the nozzle leakage pipe.
![]() |
Set the leakage pipe and 5 new gaskets in place.
Apply a light amount of oil to the 4 injector hollow screws and union bolt.
Temporarily install the leakage pipe with the 4 injector hollow screws and union bolt.
Tighten the 4 holder clamp bolts.
Remove the 4 injection pipes.
![]() |
Tighten the 4 injector hollow screws in order from 1 to 4.
| *1 | Union Bolt |
Tighten the union bolt.
| 2. INSPECT FOR FUEL LEAK |
![]() |
Check that there are no leaks from the nozzle leakage pipe connection.
Install the gasket and No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).
Apply a light amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.
![]() |
Install SST (turbocharger pressure gauge) to the fuel return side of the leakage pipe and maintain 100 kPa (1.0 kgf/cm2, 15 psi) of pressure for 60 seconds to check that no bubbles form.
After checking for fuel leaks, wipe off the soapy water from the leakage pipe connection.
Remove SST, the No. 2 nozzle leakage pipe and gasket.
| 3. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
![]() |
Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.
| *1 | No. 3 Cylinder Head Cover Gasket |
| *2 | Cylinder Head Cover |
Remove any old seal packing (FIPG material) from the cylinder head.
![]() |
Apply seal packing to the specific areas shown in the illustration.
![]() | Seal Packing |
Install a new cylinder head cover gasket and the cylinder head cover with the 10 bolts and 2 nuts.
Install 4 new nozzle holder seals.
Connect the ventilation hose.
Connect the 4 connectors and install the 3 bolts.
| 4. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY |
Temporarily install the No. 2 nozzle leakage pipe with the 3 bolts.
Temporarily install a new gasket and the union bolt.
Tighten the 3 bolts and union bolt.
Connect the 3 fuel hoses.
| 5. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY |
Temporarily install the No. 4 injection pipe with the union nuts.
Install the bolt.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
| 6. TEMPORARILY INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY |
Place a new gasket, the electric EGR control valve, another new gasket and the intake air connector onto the stud bolts of the No. 2 intake air connector and temporarily install the 3 nuts labeled A in the illustration.
Install a new gasket and the EGR valve adapter to the electric EGR control valve with the 2 bolts labeled B in the illustration.
Set a new gasket on the intake manifold.
Temporarily install the intake air connector to the intake manifold with the 3 bolts labeled C in the illustration.

| *1 | No. 2 Intake Air Connector | *2 | Electric EGR Control Valve |
| *3 | Intake Air Connector | *4 | EGR Valve Adapter |
| *5 | New Gasket | *6 | Claw |
| *7 | Intake Manifold | - | - |
| *a | 0 to 2 threads | - | - |
| 7. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY |
Temporarily install the No. 1 EGR pipe and 2 new gaskets to the cylinder head and EGR valve adapter with the 2 nuts and 2 bolts.
Tighten the 2 bolts labeled A.
Tighten the 2 nuts labeled B.

| *1 | New Gasket | *2 | Claw |
| 8. TIGHTEN INTAKE AIR CONNECTOR |
Tighten the 3 nuts labeled A in the illustration.
Tighten the 3 bolts labeled B in the illustration.

| *a | Front Side of Vehicle | - | - |
| 9. INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET |
![]() |
Temporarily install the No. 2 intake air connector bracket with the 3 bolts.
Tighten the bolt labeled A.
Tighten the 2 bolts labeled B.
| 10. INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (for EGR) |
Install the electric vacuum regulating valve bracket with the 2 bolts.
Install the No. 1 gas filter with gas filter bracket with the bolt.
Connect the 6 vacuum hoses.
Connect the 2 connectors.
| 11. CONNECT NO. 3 WATER BY-PASS PIPE |
Connect the No. 3 water by-pass pipe with wire harness with the 2 bolts.
| 12. INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY |
Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.
![]() |
Install the No. 2 and No. 3 injection pipe clamps with the 2 bolts and 2 nuts as shown in the illustration.
| *1 | No. 2 Injection Pipe |
| *2 | Painted Mark |
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
| 13. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
| 14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 15. BLEED AIR FROM FUEL SYSTEM |
![]() |
Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.
Check if the engine starts.
When the engine can be started, proceed to the next step.
If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.
Turn the ignition switch off.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON and turn the intelligent tester on.
Clear the DTCs (Click here).
Start the engine.*1
![]() |
Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
| *a | Reference (Active Test Operation) |
Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3
Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.

Enter the following menus: Powertrain / Engine and ECT / DTC.
Read Current DTCs.
Clear the DTCs (Click here).
Repeat steps *1 to *3.
Enter the following menus: Powertrain / Engine and ECT / DTC.
Read Current DTCs.
| 16. PERFORM REGISTRATION |
Perform registration of injector compensation codes .
Perform registration of pilot quantity learning (Click here).
| 17. INSPECT FOR FUEL LEAK |
Check that there are no leaks from any part of the fuel system when the engine is stopped. If there is fuel leakage, repair or replace parts as necessary.
Start the engine and check that there are no leaks from any part of the fuel system. If there is fuel leakage, repair or replace parts as necessary.
Disconnect the return hose from the common rail.
Start the engine and check for fuel leaks from the return pipe.
If there is fuel leakage, replace the common rail.
Connect the intelligent tester to the DLC3.
Start the engine and push the intelligent tester main switch on.
Select the Fuel Leak test from the Active Test mode on the intelligent tester.
If the intelligent tester is not available, fully depress the accelerator pedal quickly. Increase the engine speed to the maximum and maintain that speed for 2 seconds. Repeat this operation several times.
Check that there are no leaks from any part of the fuel system.
Reconnect the return hose to the common rail.
| 18. INSPECT FOR OIL LEAK |
Start the engine. Make sure that there are no oil leaks from the areas that were worked on.
| 19. INSPECT ENGINE OIL LEVEL |
Warm up the engine, stop the engine and wait 5 minutes. The engine oil level should be between the dipstick low level mark and full level mark.
If low, check for leakage and add oil up to the full level mark.