2014 Hilux · Service Manual ENGINE

ECM Power Source Circuit

Circuit diagnosis · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The MREL output signal from ECM causes a current to flow to the coil, closing the contacts of the MAIN relay and supplying power to terminal +B of the ECM.

WIRING DIAGRAM

A258907E01

INSPECTION PROCEDURE

NOTICE:
  1. After replacing the ECM, the new ECM needs registration (Click here) and initialization (Click here).
  2. Inspect the fuses of circuits related to this system before performing the following inspection procedure.


1. INSPECT ECM (+B AND +B2 VOLTAGE)
  1. Turn the ignition switch to ON.

  1. A258708E07
    Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    E31-24 (+B) - E25-1 (E1)
    Ignition switch ON
    11 to 14 V
    E31-17 (+B2) - E25-1 (E1)
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (ECM)



NG
Go to step 2
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)

2. CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    E25-1 (E1) - Body ground
    Always
    Below 1 Ω

  1. Reconnect the ECM connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3. INSPECT ECM (IGSW VOLTAGE)

  1. A258708E08
    Turn the ignition switch to ON.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    E30-24 (IGSW) - E25-1 (E1)
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (ECM)



NG
Go to step 7
OK


4. INSPECT ECM (MREL VOLTAGE)

  1. A258708E09
    Turn the ignition switch to ON.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    E30-11 (MREL) - E25-1 (E1)
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (ECM)



NG
REPLACE ECM (Click here)
OK


5. INSPECT NO. 1 INTEGRATION RELAY (MAIN RELAY)
  1. Inspect the No. 1 integration relay (MAIN relay) (Click here).



NG
REPLACE NO. 1 INTEGRATION RELAY (MAIN RELAY)
OK


6. CHECK HARNESS AND CONNECTOR (MAIN RELAY - ECM, MAIN RELAY - BODY GROUND)
  1. Check the harness and connector between the No. 1 integration relay (MAIN relay) and ECM.

    1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Disconnect the ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1J-4 - E31-24 (+B)
      Always
      Below 1 Ω
      1J-5 - E31-17 (+B2)
      Always
      Below 1 Ω
      1J-2 - E30-11 (MREL)
      Always
      Below 1 Ω
      1J-4 or E31-24 (+B) - Body ground
      Always
      10 kΩ or higher
      1J-5 or E31-17 (+B2) - Body ground
      Always
      10 kΩ or higher
      1J-2 or E30-11 (MREL) - Body ground
      Always
      10 kΩ or higher

    4. Reconnect the ECM connector.

    5. Reinstall the No. 1 integration relay.

  1. Check the harness and connector between the No. 1 integration relay (MAIN relay) and body ground.

    1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1J-3 - Body ground
      Always
      Below 1 Ω

    3. Reinstall the No. 1 integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - MAIN RELAY)

7. INSPECT IGNITION SWITCH
  1. Inspect the ignition switch (Click here).



NG
REPLACE IGNITION SWITCH (Click here)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - IGNITION SWITCH, IGNITION SWITCH - ECM)


← ECM Power Source Circuit (Aug 2012 – Jul 2013)ECM Power Source Circuit (from Aug 2014) →