2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

  1. A111695
    Install a new O-ring to the oil control valve.

  1. Install the oil control valve with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

  1. Connect the oil control valve connector.


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

3. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

← INSPECTION (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →