2014 Hilux · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built from Jun 2011


1. INSTALL INPUT SHAFT FRONT BEARING

C086534E01
  1. Using SST and a press, press in a new front bearing.

    SST
    09316-60011  

  1. D033850E01
    Select a snap ring that will allow minimal axial play.

    Standard clearance:
    0.10 mm (0.0039 in.) or less

    Standard front bearing shaft snap ring thickness:
    Mark
    Thickness
    0
    2.05 to 2.10 mm (0.0807 to 0.0827 in.)
    1
    2.10 to 2.15 mm (0.0827 to 0.0847 in.)
    2
    2.15 to 2.20 mm (0.0847 to 0.0866 in.)
    3
    2.20 to 2.25 mm (0.0866 to 0.0886 in.)
    4
    2.25 to 2.30 mm (0.0886 to 0.0906 in.)
    5
    2.30 to 2.35 mm (0.0906 to 0.0925 in.)

  1. D033851E01
    Using a snap ring expander, install the snap ring.


2. INSTALL INPUT SHAFT BEARING

C086536E01
  1. Coat the 13 input shaft bearings with MP grease, and install them to the input shaft.


3. INSTALL NO. 2 SYNCHRONIZER RING

C067214E01
  1. Coat the No. 2 synchronizer ring with gear oil, and install it to the input shaft.

← REMOVAL (from Jun 2011)COMPONENTS (from Jun 2011) →