2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

  1. A135921
    Install a new gasket and the throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. A135920
    Connect the 2 connectors.


2. INSTALL INTERCOOLER ASSEMBLY WITH INTAKE AIR CONNECTOR
  1. Install the intake air connector to the air hoses.

  1. A135919
    Install the intercooler with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. A149934
    Install a new No. 2 air hose and then tighten the 2 hose clamps.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. A149933
    Tighten the 2 hose clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. A149802
    Connect the IAT sensor connector and manifold absolute diesel pressure sensor connector.

  1. Connect the vacuum hose to the manifold absolute pressure sensor.

  1. Attach the 2 clamps.


3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

A135916
  1. Install the engine cover with the 3 bolts and 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }


4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

5. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

← REMOVAL (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →