INSTALLATION
Removal / installation · Vehicles built from Aug 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL GLOW PLUG ASSEMBLY |
 |
Using a 12 mm deep socket wrench, install the 4 glow plugs.
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
| 2.
INSTALL NO. 1 INTAKE MANIFOLD INSULATOR |
 |
- Install the manifold insulator to the cylinder head.
| 3.
INSTALL NO. 1 GLOW PLUG CONNECTOR |
 |
Install the glow plug connector by uniformly tightening the 4 nuts.
-
Torque:
- 2.2 N*m{
22 kgf*cm
, 19 in.*lbf
}
Install the 4 screw grommets.
- Install the wire harness with the nut.
-
Torque:
- 2.0 N*m{
20 kgf*cm
, 18 in.*lbf
}
Install the No. 2 intake manifold stay with the bolt.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
| 4.
INSTALL EGR COOLER |
 |
Install the EGR cooler (Click here).
| 5.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 6.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.