2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2013

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL VACUUM SWITCHING VALVE (for EGR Cut)

A112098
  1. Install the valve with the bolt.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }


2. INSTALL VACUUM SWITCHING VALVE BRACKET

  1. A110298
    Install the bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the vacuum hoses to the 3 locations.

  1. Connect the 2 connectors.


3. INSTALL CHARGE AIR COOLER ASSEMBLY

  1. A112150
    Install a new gasket and the intake air connector with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A112149
    Using a 22 mm deep socket wrench, install a new gasket and the IAT sensor.

    Torque:
    29.4 N*m{ 300 kgf*cm , 22 ft.*lbf }

  1. A110367E01
    Install the CAC with the 4 bolts.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for bolt A

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf } for bolt B

  1. A110366
    Install a new No. 2 air hose and then tighten the 2 hose clamps.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. A252792
    Tighten the 2 hose clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Connect the diesel turbo IAT sensor connector.


4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A110362
    Install the cover with the 3 bolts and 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }


5. CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

6. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    CAUTION:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from negative (-) battery terminal.

← INSTALLATION (Aug 2012 – Jul 2013)COMPONENTS (from Jun 2011) →