INSTALLATION
Removal / installation · Vehicles built from Aug 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
- NOTICE:
- When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
- When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
- After removing the injection pipes, clean them with a brush and compressed air.
- When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
| 1. INSTALL ENGINE WATER PUMP ASSEMBLY |
Install a new gasket and the engine water pump with the 5 bolts and 2 nuts.
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
| 2. INSTALL NO. 2 TIMING BELT COVER |
Apply seal packing (FIPG) to the specified areas shown in the illustration.

- Seal packing:
- Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Text in Illustration *1
Seal Packing
- NOTICE:
- After applying seal packing, install the No. 2 timing belt cover within 3 minutes and tighten the bolts and nut within 15 minutes.
Clean the bolts and their holes.
Apply adhesive to 2 or 3 threads at the end of each of the 4 bolts.
- Adhesive:
- Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
Install the No. 2 timing belt cover with the 4 bolts and nut.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
| 3. INSTALL CAMSHAFT TIMING PULLEY |
Install the camshaft timing pulley.
Install the bolt of the camshaft timing pulley while holding the camshaft with a wrench.
- Torque:
- 98 N*m{ 1000 kgf*cm , 72 ft.*lbf }
| 4. INSTALL TIMING BELT |
Check that the timing marks are aligned as shown in the illustration.

- HINT:
- If reusing the timing belt, align the points marked during removal, and install the belt with the arrow pointing in the direction of engine revolution.
- NOTICE:
- The engine should be cold.
- When turning the crankshaft, the valve heads will hit against the piston's top position. Do not turn it more than necessary.
- The engine should be cold.
Using a 10 mm hexagon wrench, install the timing belt idler pulley and new washer with the bolt.
- Torque:
- 35 N*m{ 357 kgf*cm , 26 ft.*lbf }
Check that the idler pulley moves smoothly.
If it does not move smoothly, check the idler sub-assembly and washer.
Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.
Place the tensioner upright. Then set the press to the top of the tensioner.

- NOTICE:
- Do not scratch or deform the rod end.
- Press in the tensioner rod upward.
- Protect the tip of the push rod with a cloth in order to prevent damage.
- Do not scratch or deform the rod end.
Using a press, slowly push in the push rod using 981 to 9800 N (100 to 999 kgf, 220 to 2203 lbf) of force.
- NOTICE:
- Do not impose a load of over 9800 N (100 to 999 kgf, 2203 lbf) to the push rod.
Align the holes of the push rod and housing. Then pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.
Install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.
Tighten the 2 bolts.
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
- NOTICE:
- Uniformly tighten the 2 bolts and install the tensioner.
Remove the 1.5 mm hexagon wrench from the tensioner.

Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.

| 5. INSTALL NO. 1 TIMING BELT COVER |
Install the timing belt cover with the 6 bolts.
- Torque:
- 6.0 N*m{ 61 kgf*cm , 53 in.*lbf }
Install the wire harness clamp.
Install the water hose clamp with the bolt.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
| 6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.

Text in Illustration *1
No. 3 Cylinder Head Cover Gasket
*2
Cylinder Head Cover
- NOTICE:
- Do not install the No. 3 cylinder head cover gaskets at an angle.
- Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.
- Do not install the No. 3 cylinder head cover gaskets at an angle.
Remove any old seal packing (FIPG material) from the cylinder head.
Apply seal packing to the specific areas shown in the illustration.

- Seal packing:
- Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Text in Illustration 

Seal Packing
- NOTICE:
- Remove any oil from the contact surface.
- Install the head cover within 3 minutes after applying seal packing.
- Do not start the engine for at least 2 hours after installing the seal packing.
- Remove any oil from the contact surface.
Install a new cylinder head cover gasket and the cylinder head cover with the 10 bolts and 2 nuts.
- Torque:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
Connect the ventilation hose.
Install 4 new nozzle holder seals.
Connect the 4 injector connectors and install the 3 bolts.
- Torque:
- 13 N*m{ 127 kgf*cm , 9 ft.*lbf }
| 7. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY |
- NOTICE:
- When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
- Keep the joints of the injection pipe clean.
- When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
Temporarily install the No. 4 injection pipe with the union nuts.
w/ Intercooler:
Install the bolt.- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
- NOTICE:
- If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection pipe clamp with a new one.
- Make sure that the inner rubbers of the injection pipe fit inside the clamps.
- When installing the pipe, check that the inner rubbers and the clamps are in their proper positions.
- If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection pipe clamp with a new one.
w/o Intercooler:
Install the 2 bolts.- Torque:
- 13 N*m{ 130 kgf*cm , 9 ft.*lbf }
- NOTICE:
- If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection pipe clamp with a new one.
- Make sure that the inner rubbers of the injection pipe fit inside the clamps.
- When installing the pipe, check that the inner rubbers and the clamps are in their proper positions.
- If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection pipe clamp with a new one.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.
- Torque:
- 35 N*m{ 357 kgf*cm , 26 ft.*lbf }
- NOTICE:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
- Torque:
- 35 N*m{ 357 kgf*cm , 26 ft.*lbf }
- NOTICE:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).
| 8. TEMPORARILY INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ Intercooler) |
Place a new gasket, the electric EGR control valve, another new gasket and the intake air connector onto the stud bolts of the No. 2 intake air connector and temporarily install the 3 nuts labeled A in the illustration.
- NOTICE:
- Temporarily install the nuts so that 0 to 2 threads of each stud bolt are visible as shown in the illustration.
Install a new gasket and the EGR valve adapter to the electric EGR control valve with the 2 bolts labeled B in the illustration.
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
- NOTICE:
- Make sure the claws of the gasket face the electric EGR control valve as shown in the illustration.
Set a new gasket on the intake manifold.
- NOTICE:
- Make sure the claws of the gasket face the intake manifold as shown in the illustration.
Temporarily install the intake air connector to the intake manifold with the 3 bolts labeled C in the illustration.


Text in Illustration *1
No. 2 Intake Air Connector
*2
Electric EGR Control Valve
*3
Intake Air Connector
*4
EGR Valve Adapter
*5
New Gasket
*6
Claw
*7
Intake Manifold
-
-
*a
0 to 2 threads
-
-
| 9. TIGHTEN INTAKE AIR CONNECTOR (w/ Intercooler) |
Tighten the 3 nuts labeled A in the illustration.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Tighten the 3 bolts labeled B in the illustration.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
- NOTICE:
- Tighten the bolts in the order shown in the illustration.


Text in Illustration *a
Front Side of Vehicle
-
-
| 10. INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET (w/ Intercooler) |
w/ Intercooler:
Temporarily install the No. 2 intake air connector bracket with the 3 bolts.

Tighten the bolt labeled A.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Tighten the 2 bolts labeled B.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
w/o Intercooler:
Install the No. 2 intake air connector bracket with the 3 bolts.- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
| 11. INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (w/ Intercooler) |
w/ Intercooler:
Install the electric vacuum regulating valve bracket with the 2 bolts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Install the No. 1 gas filter with gas filter bracket with the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 6 vacuum hoses.
- NOTICE:
- Be sure to securely connect the vacuum hoses.
Connect the 2 connectors.
w/o Intercooler:
Install the electric vacuum regulating valve together with the bracket with the 2 bolts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 2 vacuum hoses.
Connect the connector.
| 12. CONNECT NO. 3 WATER BY-PASS PIPE (w/ Intercooler) |
Connect the No. 3 water by-pass pipe with wire harness with the 2 bolts.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
| 13. INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY |
- NOTICE:
- When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
- Keep the joints of the injection pipes clean.
- When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.
w/ Intercooler:

Install the No. 2 and No. 3 injection pipe clamps with the 2 bolts and 2 nuts as shown in the illustration.- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Text in Illustration *1
No. 2 Injection Pipe
*2
No. 2 Injection Pipe Clamp
*3
No. 3 Injection Pipe Clamp
*4
Painted Mark
- HINT:
- If the painted mark on the No. 2 injection pipe has disappeared, use the illustration as a reference to install the clamps.
w/o Intercooler:

Install the No. 2 and No. 3 injection pipe clamps with the bolt and 2 nuts as shown in the illustration.- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Text in Illustration *1
No. 1 Injection Pipe
*2
No. 2 Injection Pipe Clamp
*3
No. 3 Injection Pipe Clamp
*4
Painted Mark
- HINT:
- If the painted mark on the No. 1 injection pipe has disappeared, use the illustration as a reference to install the clamps.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.
- Torque:
- 35 N*m{ 357 kgf*cm , 26 ft.*lbf }
- NOTICE:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
- Torque:
- 35 N*m{ 357 kgf*cm , 26 ft.*lbf }
- NOTICE:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).
| 14. INSTALL DIESEL THROTTLE BODY ASSEMBLY (w/ Intercooler) |
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 2 connectors.
| 15. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
Install the V-ribbed belt tensioner assembly with the 4 bolts.

- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Text in Illustration *1
V-ribbed Belt Tensioner Assembly
*2
Cylinder Block
- HINT:
- Firmly press and hold the V-ribbed belt tensioner assembly against the cylinder block to eliminate any gaps in the areas labeled A in the illustration. Then uniformly tighten the 4 bolts.
| 16. INSTALL GENERATOR BRACKET |
Install the generator bracket with the bolt.
- Torque:
- 25 N*m{ 255 kgf*cm , 18 ft.*lbf }
| 17. INSTALL GENERATOR ASSEMBLY |
![]() ![]() |
Install the generator with the 2 bolts.
- Torque:
- 62 N*m{ 632 kgf*cm , 46 ft.*lbf } for bolt A
- 25 N*m{ 255 kgf*cm , 18 ft.*lbf } for bolt B
Install the generator wire with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Connect the generator connector.
| 18. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (w/ Viscous Heater) |
Install the No. 1 viscous heater bracket sub-assembly with the 2 bolts.
- Torque:
- 45 N*m{ 459 kgf*cm , 33 ft.*lbf }
| 19. INSTALL VISCOUS HEATER WITH MAGNET CLUTCH ASSEMBLY (w/ Viscous Heater) |
Install the viscous with magnet clutch heater with the 2 bolt.

- Torque:
- 45 N*m{ 459 kgf*cm , 33 ft.*lbf }
Connect the connect.
| 20. CONNECT COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System) |
Install the cooler compressor assembly with the 4 bolts.
- Torque:
- 25 N*m{ 250 kgf*cm , 18 ft.*lbf }
| 21. INSTALL FAN SHROUD |
Install the fan pulley to the engine water pump.
Install the fan shroud together with the fluid coupling with fan between the radiator and engine component.
- NOTICE:
- Be careful not to damage the radiator core.
Install the fluid coupling with fan to the fan pulley with the 4 nuts.
Tighten the nuts as much as possible by hand.
Attach the claws of the fan shroud to the radiator.

Install the fan shroud with the 2 bolts.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Install the fan and generator V belt (Click here).
Tighten the 4 nuts of the fluid coupling with fan.
- Torque:
- 23 N*m{ 235 kgf*cm , 17 ft.*lbf }
Install the radiator reservoir with the 2 bolts.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Connect the No. 1 and No. 2 water by-pass hoses to the radiator.
Install the oil reservoir with the 3 bolts.
- Torque:
- 4.5 N*m{ 46 kgf*cm , 40 in.*lbf }
| 22. INSTALL RADIATOR HOSE INLET |
| 23. INSTALL INTERCOOLER ASSEMBLY (w/ Intercooler) |
| 24. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY (w/o Intercooler) |
Connect the pipe (with the 2 air hoses) and install the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Tighten the 2 clamps.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
w/ No. 1 Engine Cover
Install the engine cover bracket with the 2 bolts.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
Attach the 4 claws to the pins of the engine cover bracket and install the No. 1 engine cover sub-assembly.
| 25. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
| 26. ADD ENGINE COOLANT |
Tighten the radiator drain cock plug by hand.
Tighten the cylinder block drain cock plug.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.

- Standard Capacity:
Item
Specified Condition
for Automatic Transmission
11.1 liters (11.7 US qts, 9.8 Imp. qts)
for Manual Transmission
9.8 liters (10.4 US qts, 8.6 Imp. qts)
- HINT:
- TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
- TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
- Please contact your TOYOTA dealer for further details.
- Please contact your TOYOTA dealer for further details.
- NOTICE:
- Never use water as a substitute for engine coolant.
Press the radiator hose inlet and radiator hose outlet several times by hand, and then check the level of the coolant.
If the coolant level drops below the B line, add TOYOTA SLLC to the B line.
Install the radiator reservoir cap.
Using a wrench, install the vent plug.

- Torque:
- 2.0 N*m{ 20 kgf*cm , 18 in.*lbf }
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2500 to 3000 rpm.
Press the radiator hose inlet and radiator hose outlet several times by hand to bleed air.
- CAUTION:
- When pressing the radiator hoses:
- Wear protective gloves.
- Wear protective gloves.
- Be careful as the radiator hoses are hot.
- Be careful as the radiator hoses are hot.
- Keep your hands away from the radiator fan.
- Keep your hands away from the radiator fan.
Stop the engine and wait until the coolant cools down to ambient temperature.
- CAUTION:
- Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
After the coolant cools down, check that the coolant level is at the F line.

If the coolant level is below the F line, add TOYOTA SLLC to the F line.
| 27. BLEED AIR FROM FUEL SYSTEM |
Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.

- NOTICE:
- Hand pump pumping speed: Max. 2 strokes/ sec.
- The hand pump must be pushed with a full stroke during pumping.
- When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
- If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
- If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
- If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use, and the engine cannot be started.
- Hand pump pumping speed: Max. 2 strokes/ sec.
Check if the engine starts.
- NOTICE:
- Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
- Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
- Use a fully-charged battery.
- Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
When the engine can be started, proceed to the next step.
If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.
Turn the ignition switch off.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON and turn the intelligent tester on.
Clear the DTCs (Click here).
Start the engine.*1
Enter the following menus: Powertrain / Engine / Active Test / Test the Fuel Leak.*2
Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3
Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.


- HINT:
- When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.
Enter the following menus: Powertrain / Engine / DTC.
Read Current DTCs.
Clear the DTCs (Click here).
- HINT:
- It is necessary to clear the DTCs, as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.
Repeat steps *1 to *3.
Enter the following menus: Powertrain / Engine / DTC.
Read Current DTCs.
- OK:
- No DTCs are output.
| 28. INSPECT FOR COOLANT LEAK |
- NOTICE:
- Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
Fill the radiator with coolant and attach a radiator cap tester.

Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2 ,17.1 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks.
If no external leaks are found, check the cylinder block and head.
| 29. INSPECT FOR FUEL LEAK |
- CAUTION:
- During Active Test mode, the engine speed becomes high and the combustion noise becomes loud, so pay attention.
- During Active Test mode, the fuel pressure becomes high. Be extremely careful not to expose your eyes, hands, or body to escaping fuel.
- During Active Test mode, the engine speed becomes high and the combustion noise becomes loud, so pay attention.
Check that there are no leaks from any part of the fuel system when the engine is stopped. If there is fuel leakage, repair or replace parts as necessary.
Start the engine and check that there are no leaks from any part of the fuel system. If there is fuel leakage, repair or replace parts as necessary.
Disconnect the return hose from the common rail.
Start the engine and check for fuel leaks from the return pipe.
If there is fuel leakage, replace the common rail.
Connect the intelligent tester to the DLC3.
Start the engine and turn the intelligent tester main switch on.
Select the Fuel Leak test from the Active Test mode on the intelligent tester.
If the intelligent tester is not available, fully depress the accelerator pedal quickly. Increase the engine speed to the maximum and maintain that speed for 2 seconds. Repeat this operation several times.
Check that there are no leaks from any part of the fuel system.
- NOTICE:
- A return pipe leakage of less than 10 cc (0.6 cu in.) per minute is acceptable.
Reconnect the return hose to the common rail.
| 30. INSPECT FOR OIL LEAK |
Start the engine. Make sure that there are no oil leaks from the areas that were worked on.
| 31. INSTALL NO. 1 ENGINE UNDER COVER (for 4WD and Pre-Runner) |
- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }

