2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013

NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
  3. After removing the injection pipes, clean them with a brush and compressed air.


1. INSTALL TIMING GEAR CASE ASSEMBLY

  1. A060152E04
    Install 2 new O-rings to the cylinder block.
    Text in Illustration 
    *1
    New O-Ring

  1. A239302E01
    Install a new gasket to the groove of the timing gear case.
    Text in Illustration 
    *1
    New Gasket

  1. Remove any old seal packing (FIPG material).

  1. A100875E05
    Apply seal packing to the timing gear case as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.157 in.)

    Text in Illustration 
    *1
    Seal Packing

    NOTICE:
    After applying seal packing, install the timing gear case assembly within 3 minutes and tighten the bolts within 15 minutes.

  1. A060280E01
    Install the timing gear case with the union bolt and 8 bolts.

    Torque:
    for union bolt (A):
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }
    for bolt:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


2. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


3. INSTALL OIL PAN SUB-ASSEMBLY

  1. A151187E03
    Remove any old seal packing (FIPG material).

  1. Apply seal packing to the oil pan as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal packing diameter:
    4 mm (0.157 in.)

    NOTICE:
    After applying seal packing, install the oil pan within 3 minutes and tighten the bolts and nuts within 15 minutes.

  1. Install the oil pan with the 22 bolts and 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


4. INSTALL INJECTION GEAR
  1. Install a new O-ring and the fuel supply pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Temporarily install the injection gear with the nut.

    HINT:
    Fit the key (protrusion) of the fuel supply pump into the key slot of the injection gear.

  1. A222336E02
    Install a new O-ring to the injection gear.
    Text in Illustration 
    *1
    New O-Ring

  1. A069845E02
    Install the injection gear set nut.

  1. Using SST, tighten the set nut.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    64 N*m{ 650 kgf*cm , 47 ft.*lbf }


5. INSTALL CRANKSHAFT TIMING GEAR

A061827E01
  1. Position the crankshaft timing gear with the "1" timing marks facing forward.

  1. Align the key groove of the crankshaft timing gear with the set key on the crankshaft.

  1. Using SST and a hammer, tap on the timing gear to install it.

    SST
    09223-00010  


6. INSTALL NO. 1 IDLE GEAR SHAFT

  1. A069846E01
    Apply a coat of engine oil to the No. 1 idle gear shaft.
    Text in Illustration 
    *1
    Engine Oil

  1. A060159E07
    Install the gear shaft as shown in the illustration.
    Text in Illustration 
    *1
    Oil Hole


7. INSTALL NO. 1 IDLE GEAR

  1. G036757E04
    Align the "4" and "5" timing marks of the idle gear and crankshaft timing gear.
    Text in Illustration 
    *a
    Turn

  1. Using SST, turn the injection gear and align the "4" timing marks of the idle gear and injection gear, and then mesh the gears.

    SST
    09960-10010   (09962-01000, 09963-00700)

  1. A222334E02
    Position the idle gear thrust plate with the protrusion facing forward.
    Text in Illustration 
    *1
    Service Bolt

  1. Align the bolt holes and install the idle gear thrust plate with the 2 bolts.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

  1. Remove the service bolt.


8. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
  1. Align the key groove of the No. 1 crankshaft position sensor plate with the set key.

  1. Install the No. 1 crankshaft position sensor plate with the cupped side facing outward.


9. INSTALL TIMING GEAR COVER
  1. Remove any old seal packing (FIPG material).

  1. A225340E01
    Apply seal packing to the timing gear cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.157 in.)

    Text in Illustration 
    *1
    Seal Packing

    NOTICE:
    After applying seal packing, install the timing gear cover within 3 minutes and tighten the bolts within 15 minutes.

  1. Install a new O-ring to the timing gear case.

  1. Install the timing gear cover with the 14 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A248630
    Remove the screw plug and gasket.

  1. Pour approximately 50 cc (3.05 cu. in.) of engine oil into the oil pump.

  1. Install a new gasket and the screw plug.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }

  1. Install the vacuum transmitting pipe with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


10. INSTALL CRANKSHAFT PULLEY
  1. Align the keyway of the pulley with the key located on the crankshaft, and then slide the pulley into place to install it.

  1. A251844E01
    Using SST, install the pulley bolt.
    SST
    09213-58014  
    09330-00021  

    Torque:
    365 N*m{ 3722 kgf*cm , 269 ft.*lbf }


11. INSTALL PUMP DRIVE SHAFT PULLEY
  1. Install a new O-ring to the fuel supply pump.

  1. Temporarily install the fuel supply pump with the nut.

  1. A070711E01
    Using SST, hold the crankshaft pulley and tighten the nut.
    SST
    09213-58014  
    09330-00021  

    Torque:
    64 N*m{ 650 kgf*cm , 47 ft.*lbf }

  1. A038747E01
    Install the No. 2 camshaft timing pulley flange and pump drive shaft pulley with the 4 bolts.

    Torque:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }

  1. A036609E01
    Using a dial indicator, check the thrust clearance of the pump drive shaft while moving the pump drive shaft pulley back and forth.

    Standard thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    HINT:
    If the clearance is not within the specified range, remove and reinstall the fuel supply pump and pump drive shaft pulley. Then repeat the step above.


12. INSTALL CRANKSHAFT POSITION SENSOR
  1. Apply a light coat of engine oil to the O-ring of the sensor.

  1. Install the sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }


    A112049

  1. Install the 3 clips and connect the sensor connector.

    NOTICE:
    Insert the crankshaft position sensor wire harness into the protrusions of the timing gear cover as shown in the illustration.


13. INSTALL CAMSHAFT POSITION SENSOR

  1. A135909
    Apply a light coat of engine oil to the O-ring of the sensor.

  1. Install the sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

  1. Connect the sensor connector.


14. INSTALL VANE PUMP ASSEMBLY
  1. Install a new O-ring to the vane pump.

  1. Install the vane pump with the 2 nuts.

    Torque:
    41 N*m{ 418 kgf*cm , 30 ft.*lbf }


15. INSTALL VACUUM PUMP ASSEMBLY
  1. Install 2 new O-rings to the vacuum pump.

  1. Install the vacuum pump with the 2 nuts.

    Torque:
    21 N*m{ 210 kgf*cm , 15 ft.*lbf }


16. INSTALL WATER PUMP ASSEMBLY
  1. Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


17. INSTALL NO. 2 TIMING BELT COVER

  1. A060279E02
    Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    *1
    Seal Packing

    NOTICE:
    After applying seal packing, install the No. 2 timing belt cover within 3 minutes and tighten the bolts and nut within 15 minutes.

  1. Clean the bolts and their holes.

  1. Apply adhesive to 2 or 3 threads at the end of each of the 4 bolts.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


18. INSTALL CAMSHAFT TIMING PULLEY
  1. Install the camshaft timing pulley.

  1. Install the bolt of the camshaft timing pulley while holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1000 kgf*cm , 72 ft.*lbf }


19. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A289512E01
    Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.
    Text in Illustration 
    *1
    No. 3 Cylinder Head Cover Gasket
    *2
    Cylinder Head Cover

    NOTICE:
    1. Do not install the No. 3 cylinder head cover gaskets at an angle.
    2. Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.

  1. Remove any old seal packing (FIPG material) from the cylinder head.

  1. A257065
    Apply seal packing to the areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    V100155
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the cylinder head cover.

  1. Install a new cylinder head cover gasket to the cylinder head cover.

  1. A223193E01
    Temporarily install the cylinder head cover with the 10 bolts and 2 nuts in the order shown in the illustration. Then, tighten the 10 bolts and 2 nuts in the order shown in the illustration in 2 progressive steps.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the ventilation hose.

  1. Install 4 new nozzle holder seals.


20. INSTALL NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Install the No. 2 cylinder head cover with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


21. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

  1. A252281E01
    Temporarily install the No. 2 nozzle leakage pipe with the 2 bolts.
    Text in Illustration 
    V100136
    Union Bolt

  1. Temporarily install a new gasket and the union bolt.

  1. Tighten the 2 bolts and union bolt.

    Torque:
    for bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt B:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }
    for union bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


22. INSTALL NO. 3 NOZZLE LEAKAGE PIPE

  1. A239519E01
    Apply a light coat of fuel to the O-ring of the fuel check valve.
    Text in Illustration 
    *1
    O-Ring

  1. A252280
    Temporarily install the No. 3 nozzle leakage pipe with the 2 bolts.
    Text in Illustration 
    V100136
    Fuel Check Valve

  1. Temporarily install a new gasket and the fuel check valve.

  1. Tighten the 2 bolts and fuel check valve.

    Torque:
    for bolt:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }
    for fuel check valve:
    32 N*m{ 321 kgf*cm , 23 ft.*lbf }

  1. Connect the 3 fuel hoses.


23. INSTALL NO. 2 FUEL PIPE

  1. A239520E01
    Apply a light coat of fuel to the O-ring of the fuel check valve.
    Text in Illustration 
    *1
    O-Ring

  1. A257082E01
    Temporarily install the No. 2 fuel pipe with the 3 bolts.
    Text in Illustration 
    *1
    Gasket
    *2
    No. 1 Fuel Pipe
    V100135
    Bolt
    V100136
    Supply Pump Hollow Screw
    V100137
    Fuel Check Valve
    V100138
    Union Bolt

  1. Install a new gasket to the No. 1 fuel pipe and temporarily install the union bolt.

  1. Temporarily install a new gasket and the fuel check valve.

    NOTICE:
    When temporarily installing the fuel check valve, position the gasket as shown in the illustration.

  1. Temporarily install a new gasket and the supply pump hollow screw.

  1. Using a 6 mm hexagon wrench, tighten the supply pump hollow screw.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the 3 bolts, fuel check valve and union bolt.

    Torque:
    for bolt:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }
    for fuel check valve:
    32 N*m{ 321 kgf*cm , 23 ft.*lbf }
    for union bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    When tightening the fuel check valve, replace the gasket if it becomes deformed.


24. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY

NOTICE:
  1. When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
  2. Keep the joints of the injection pipe clean.

  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install the 2 No. 2 injection pipe clamps with the bolt and nut.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).


25. INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY WITH NO. 2 EGR VALVE AND COOLER
(Click here)

26. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System)
  1. Install the No. 1 compressor mounting bracket with the 4 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


27. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. A097638E05
    Install the V-ribbed belt tensioner with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Text in Illustration 
    *1
    Cylinder Block
    *2
    V-ribbed Belt Tensioner

    HINT:
    Firmly press and hold the V-ribbed belt tensioner against the cylinder block to eliminate any gaps in the areas labeled A in the illustration. Then uniformly tighten the 4 bolts.


28. INSTALL GENERATOR BRACKET
  1. Install the generator bracket with the bolt.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


29. INSTALL GENERATOR ASSEMBLY

A111821E01
  1. Install the generator with the 2 bolts.

    Torque:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf } for bolt A
    25 N*m{ 255 kgf*cm , 18 ft.*lbf } for bolt B

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the generator connector.


30. INSTALL NO. 2 IDLE PULLEY ASSEMBLY
  1. Install the spacer, No. 2 idle pulley and pulley plate with the bolt.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


31. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (w/ Viscous Heater)
  1. Install the No. 1 viscous heater bracket with the 4 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


32. INSTALL VISCOUS HEATER WITH MAGNET CLUTCH ASSEMBLY (w/ Viscous Heater)
(Click here)

33. INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY
  1. Using a 10 mm hexagon wrench, install a new washer and the No. 1 timing belt idler with the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. Check that the idler pulley moves smoothly.
    If the idler pulley does not move smoothly, check the installation condition of the idler and washer.


34. INSTALL TIMING BELT

  1. A070691E05
    Check that the timing marks are aligned as shown in the illustration.
    Text in Illustration 
    *1
    Timing Mark

    NOTICE:
    1. Make sure that the engine is cold.
    2. When turning the crankshaft, the valve heads will hit against the piston. Do not turn the crankshaft more than necessary.

    HINT:
    If reusing the timing belt, align the points marked during removal, and install the belt with the arrow pointing in the direction of crankshaft revolution.

  1. Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.

  1. A070548E01
    Place the tensioner upright. Then set a press on the top of the tensioner.

    NOTICE:
    1. Do not scratch or deform the rod end.
    2. Press in the tensioner rod.
    3. Protect the tip of the push rod with a cloth in order to prevent damage.

  1. Using the press, slowly push in the push rod using 981 to 9800 N (100 to 999 kgf, 220 to 2203 lbf) of force.

    NOTICE:
    Do not apply a load of over 9800 N (999 kgf, 2203 lbf) to the push rod.

  1. Align the holes of the push rod and housing. Then pass a 1.5 mm hexagon wrench through the holes to fix the push rod in place.

  1. Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts.

  1. A059983E01
    Remove the 1.5 mm hexagon wrench from the tensioner.

  1. A070549E05
    Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.
    Text in Illustration 
    *1
    Timing Mark


35. INSTALL NO. 1 TIMING BELT COVER
  1. Install the timing belt cover and 6 washers with the 6 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


36. INSTALL ENGINE ASSEMBLY
(Click here)

37. ADD ENGINE OIL
  1. Add new engine oil.

    Standard Oil Grade:
    Oil Grade
    Oil Viscosity (SAE)
    ACEA C2
    - 0W-30
    - 5W-30


    Standard Capacity:
    Item
    Specified Condition
    Drain and refill without oil filter change
    6.6 liters (7.0 US qts, 5.8 Imp. qts)
    Drain and refill with oil filter change
    6.9 liters (7.3 US qts, 6.1 Imp. qts)
    Dry fill
    7.4 liters (7.8 US qts, 6.5 Imp. qts)

  1. Install the oil filler cap.


38. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


39. BLEED AIR FROM FUEL SYSTEM

  1. A098962E02
    Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. Hand pump pumping speed: Max. 2 strokes/ sec.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use, and the engine cannot be started.

  1. Check if the engine starts.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1

  1. A194065E05
    Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
    Text in Illustration 
    *a
    Reference
    (Active Test Operation)

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3

  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.

    A192848E05

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs, as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.


40. ADD ENGINE COOLANT
  1. Tighten the radiator drain cock plug by hand.

  1. Tighten the cylinder block drain cock plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A098989E01
    Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.

    Standard capacity:
    9.8 liters (10.4 US qts, 8.6 Imp. qts)

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level drops below the B line, add TOYOTA SLLC to the B line.

  1. Install the radiator reservoir cap.

  1. A099591E01
    Using a wrench, install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Bleed air from the cooling system.

    1. Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.

      HINT:
      The thermostat open timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

    2. Maintain the engine speed at 2500 to 3000 rpm.

    3. Press the inlet and outlet radiator hoses several times by hand to bleed air.

      CAUTION:
      When pressing the radiator hoses:
      1. Wear protective gloves.
      2. Be careful as the radiator hoses are hot.
      3. Keep your hands away from the radiator fan.

    4. Stop the engine and wait until the coolant cools down to ambient temperature.

      CAUTION:
      Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. G036768E01
    After the coolant cools down, check that the coolant level is at the F line.
    If the coolant level is below the F line, add TOYOTA SLLC to the F line.


41. BLEED AIR FROM POWER STEERING SYSTEM

  1. A098962E02
    Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. Hand pump pumping speed: Max. 2 strokes/ sec.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use, and the engine cannot be started.

  1. Check if the engine starts.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1

  1. A194065E05
    Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
    Text in Illustration 
    *a
    Reference
    (Active Test Operation)

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3

  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.

    A192848E05

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs, as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.


42. INSPECT FOR POWER STEERING FLUID LEVEL
  1. Check the fluid level.

  1. Jack up the front of the vehicle and support it with stands.

  1. Turn the steering wheel.

    1. With the engine stopped, turn the steering wheel slowly from lock to lock several times.

  1. Lower the vehicle.

  1. Start the engine. Run the engine at idle for a few minutes.

  1. Turn the steering wheel.

    1. With the engine idling, turn the steering wheel to the left or right full lock position and hold it there for 2 to 3 seconds. Then turn the steering wheel to the opposite full lock position and hold it there for 2 to 3 seconds.

    2. Repeat the step above several times.

  1. Stop the engine.

  1. F040897E01
    Check for foaming or emulsification. If the system has to be bled twice because of forming or emulsification, check for fluid leaks in the system.

  1. Check the fluid level.


43. PERFORM REGISTRATION
  1. Perform registration of the injector compensation codes (Click here).

  1. Perform pilot quantity learning (Click here).


44. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the areas that were worked on.


45. INSPECT FOR COOLANT LEAK

NOTICE:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A097645E01
    Fill the radiator with coolant and attach a radiator cap tester to the radiator reservoir.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2 ,17.1 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks.
    If no external leaks are found, check the cylinder block and head.


46. INSPECT FOR EXHAUST GAS LEAK
  1. If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.

47. INSPECT FOR FUEL LEAK
  1. Perform the Active Test.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch to ON.

    3. Turn the intelligent tester on.

    4. Enter the following menus: Powertrain / Engine and ECT / Active Test.

    5. Perform the Active Test.

      Intelligent Tester Display
      Test Part
      Control Range
      Diagnostic Note
      Test the Fuel Leak
      Pressurize common rail interior and check for fuel leaks
      Stop/Start
      1. The fuel pressure inside the common rail increases to the specified value and the engine speed increases to 2000 rpm when the Active Test is performed.
      2. The above conditions are maintained while the Active Test is being performed.


48. INSPECT ENGINE OIL LEVEL
  1. Warm up the engine, stop the engine and wait 5 minutes. The engine oil level should be between the dipstick low level mark and full level mark.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.

← REASSEMBLY (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →