INSTALLATION
Removal / installation · Vehicles built from Aug 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL GENERATOR ASSEMBLY |
![]() ![]() |
Install the generator with the 2 bolts.
- Torque:
- 43 N*m{ 438 kgf*cm , 32 ft.*lbf }
Install the generator wire with the nut and 2 bolts.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf } for nut
- 12.5 N*m{ 127 kgf*cm , 9 ft.*lbf } for bolt
Install the terminal cap.
Connect the generator connector.
| 2. INSTALL DRIVE BELT |
![]() ![]() |
While turning the belt tensioner counterclockwise, align its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.
Install the V-ribbed belt.
While turning the belt tensioner counterclockwise, remove the bar.
If it is hard to install the V-ribbed belt, perform the following procedure.

Put the V-ribbed belt on everything except the P/S pump as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.
| 3. INSTALL V-BANK COVER |
![]() ![]() |
While turning the belt tensioner counterclockwise, align its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.
Install the V-ribbed belt.
While turning the belt tensioner counterclockwise, remove the bar.
If it is hard to install the V-ribbed belt, perform the following procedure.

Put the V-ribbed belt on everything except the P/S pump as shown in the illustration.
While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 5. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


