2014 Hilux · Service Manual HEATER & AIR CONDITIONING SYSTEM

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013

HINT:
  1. Use the same procedure for RHD and LHD vehicles.
  2. The procedure listed below is for LHD vehicles.


1. INSTALL COOLER SWITCH
  1. Attach the 2 claws to install the cooler switch (air conditioning switch).


2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
  1. for Manual Air Conditioning System:

    1. Connect the connectors.

    2. Attach the 4 claws to connect the air conditioner control.

    3. Attach the 10 claws and 4 clips to install the center instrument cluster finish panel.

  1. for Automatic Air Conditioning System:

    1. Connect the connectors.

    2. Attach the 8 claws and 4 clips to install the center instrument cluster finish panel.

← INSPECTION (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →