2014 Hilux · Service Manual HEATER & AIR CONDITIONING SYSTEM

INSTALLATION

Removal / installation · Vehicles built from Aug 2013

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013

HINT:
  1. Use the same procedure for RHD and LHD vehicles.
  2. The procedure listed below is for LHD vehicles.


1. INSTALL INTEGRATION PANEL SUB-ASSEMBLY

  1. E225678
    Connect the No. 1 cooler wire to integration panel sub-assembly (air conditioning panel) as shown in the illustration.

  1. Attach the 3 claws to connect the lower heater control base.

  1. Install the 4 screws.

  1. Install the 4 screws.


2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
  1. for Manual Air Conditioning System:

    1. Connect the connectors.

    2. Attach the 4 claws to connect the air conditioner control.

    3. Attach the 10 claws and 4 clips to install the center instrument cluster finish panel.

  1. for Automatic Air Conditioning System:

    1. Connect the connectors.

    2. Attach the 8 claws and 4 clips to install the center instrument cluster finish panel.

← INSTALLATION (Aug 2012 – Jul 2013)COMPONENTS (from Jun 2011) →