INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL NO. 2 GLOW PLUG CONTROLLER BRACKET |
Install the No. 2 glow plug controller bracket to the glow plug controller with the 2 screws.
- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
| 2. INSTALL NO. 1 GLOW PLUG CONTROLLER BRACKET |
Install the No. 1 glow plug controller bracket to the glow plug controller with the 2 screws.
- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
| 3. INSTALL GLOW PLUG CONTROLLER |
for LHD:
Install the glow plug controller with the nut and bolt.- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Install the glow plug controller with the 2 nuts.- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the 4 connectors and clamp.
| 4. INSTALL BATTERY AND BATTERY TRAY |
| 5. INSTALL BATTERY BRACKET |
| 6. CONNECT CABLE TO BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
