1.INSTALL MASS AIR FLOW METER
Install a new O-ring to the mass air flow meter.
Install the mass air flow meter with the 2 screws.
Connect the mass air flow meter connector.
2.INSTALL V-BANK COVER
Engine / Hybrid System>1GR-FE ENGINE CONTROL>THROTTLE BODY>INSTALLATION