When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
After removing the injection pipes and fuel inlet pipe, clean them with a brush and compressed air.
1.INSTALL INJECTOR ASSEMBLY
Be sure to install each injector, No. 1 nozzle holder clamp, washer and bolt to its original position.
Install 4 new injection nozzle seats to the cylinder head.
Apply a small amount of clean engine oil to 4 new O-rings.
| *1 | New O-Ring |
Install one of the O-rings to each injector as shown in the illustration.
Insert the 4 injectors into the cylinder head.
Insert the injector until it touches the injection nozzle seat surface.
After installing the injector to the cylinder head, the O-ring may prevent the injector from being fully seated. If so, pull out the injector and reinstall it.
Always reinstall an injector to the same place it was removed from.
For an injector that has been replaced with a new injector, register the injector compensation code (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>REGISTRATION).
| *1 | New Washer |
| *a | Downward |
Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.
| *1 | No. 1 Nozzle Holder Clamp |
The fork portion of the No. 1 nozzle holder clamp must be set on the injector.
Before tightening the bolts, check that the No. 1 nozzle holder clamps are set properly.
When installing the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a following step.
When tightening the bolts, be careful so as not to tilt the bolt or clamp.
Do not reuse the washer.
Apply a small amount of engine oil to the threads and under the heads of the clamp bolts.
Temporarily install the 4 injection pipes with the union nuts.
To position the injectors, loosely tighten the union nuts.
Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
If scratches or dents are present, replace the nozzle leakage pipe.
| *1 | Union Bolt |
Set the nozzle leakage pipe and 5 new gaskets in place.
Apply a small amount of oil to the 4 injector hollow screws and union bolt.
Temporarily install the nozzle leakage pipe with the 4 injector hollow screws and union bolt.
Tighten the 4 nozzle holder clamp bolts.
Remove the 4 injection pipes.
| *1 | Union Bolt |
Tighten the 4 injector hollow screws in order from 1 to 4.
If an injector hollow screw is accidentally tightened beyond the torque specification, it must be replaced.
Tighten the union bolt.
If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.
2.INSPECT FOR FUEL LEAK
Check that there are no leaks from the nozzle leakage pipe connection.
Install a new gasket and the No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).
23762-27010 (No. 2 nozzle leakage pipe)
90904-30012 (Gasket)
Apply a small amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.
Install SST (turbocharger pressure gauge) to the fuel return side of the nozzle leakage pipe, maintain 100 kPa (1.0 kgf/cm2, 15 psi) of pressure for 60 seconds and check that no bubbles form.
After checking for fuel leaks, wipe off the soapy water from the nozzle leakage pipe connection.
Remove SST, the No. 2 nozzle leakage pipe and gasket.
Never reinstall the disassembled union bolt to the engine.
3.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
| *1 | No. 3 Cylinder Head Cover Gasket |
| *2 | Cylinder Head Cover |
Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.
Do not install the No. 3 cylinder head cover gaskets at an angle.
Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.
Remove any old seal packing (FIPG material) from the cylinder head.
|
Seal Packing |
Apply seal packing to the areas shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
Remove any oil from the contact surface.
Install the cylinder head cover within 3 minutes after applying seal packing.
Do not start the engine for at least 2 hours after installing the cylinder head cover.
Install a new cylinder head cover gasket to the cylinder head cover.
Temporarily install the cylinder head cover with the 10 bolts and 2 nuts in the order shown in the illustration. Then, tighten the 10 bolts and 2 nuts in the order shown in the illustration in 2 progressive steps.
Connect the ventilation hose.
Install 4 new nozzle holder seals.
4.INSTALL NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY
Install the No. 2 cylinder head cover with the 3 bolts.
5.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
|
Union Bolt |
Temporarily install the No. 2 nozzle leakage pipe with the 2 bolts.
Temporarily install a new gasket and the union bolt.
Tighten the 2 bolts and union bolt.
6.INSTALL NO. 3 NOZZLE LEAKAGE PIPE
| *1 | O-Ring |
Apply a light coat of fuel to the O-ring of the fuel check valve.
|
Fuel Check Valve |
Temporarily install the No. 3 nozzle leakage pipe with the 2 bolts.
Temporarily install a new gasket and the fuel check valve.
Tighten the 2 bolts and fuel check valve.
Connect the 3 fuel hoses.
7.INSTALL NO. 2 FUEL PIPE
| *1 | O-Ring |
Apply a light coat of fuel to the O-ring of the fuel check valve.
| *1 | Gasket |
| *2 | No. 1 Fuel Pipe |
|
Bolt |
|
Supply Pump Hollow Screw |
|
Fuel Check Valve |
|
Union Bolt |
Temporarily install the No. 2 fuel pipe with the 3 bolts.
Install a new gasket to the No. 1 fuel pipe and temporarily install the union bolt.
Temporarily install a new gasket and the fuel check valve.
When temporarily installing the fuel check valve, position the gasket as shown in the illustration.
Temporarily install a new gasket and the supply pump hollow screw.
Using a 6 mm hexagon wrench, tighten the supply pump hollow screw.
Tighten the 3 bolts, fuel check valve and union bolt.
When tightening the fuel check valve, replace the gasket if it becomes deformed.
8.INSTALL WIRING HARNESS CLAMP BRACKET
Install the wiring harness clamp bracket with the bolt.
Attach the wire harness clamp.
9.INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
Keep the joints of the injection pipe clean.
Temporarily install the No. 4 injection pipe with the union nuts.
Install the 2 No. 2 injection pipe clamps with the bolt and nut.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
10.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY WITH NO. 2 EGR VALVE AND EGR COOLER
11.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
12.ADD ENGINE COOLANT
13.BLEED AIR FROM FUEL SYSTEM
14.PERFORM REGISTRATION
Perform registration of the injector compensation codes (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>REGISTRATION).
Perform pilot quantity learning (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>REGISTRATION).
15.INSPECT FOR COOLANT LEAK
16.INSPECT FOR FUEL LEAK
17.INSPECT FOR OIL LEAK
18.INSPECT ENGINE OIL LEVEL