1.INSTALL PURGE VSV
Install the purge VSV with the bolt.
Connect the 2 hoses.
Connect the connector.
2.INSTALL V-BANK COVER
Engine / Hybrid System>1GR-FE ENGINE CONTROL>THROTTLE BODY>INSTALLATION