1.INSPECT SHIFT SOLENOID VALVE SR
| *a | Component without harness connected
(Shift Solenoid Valve SR) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve SR connector terminal - Shift solenoid valve SR body | 20°C (68°F) | 11 to 15 Ω |
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| Measurement Condition | Specified Condition |
|---|---|
·
Battery positive (+) → Shift solenoid valve SR connector ·
Battery negative (-) → Shift solenoid valve SR body |
Valve moves and makes an operating noise |
If the result is not as specified, replace the solenoid valve.
2.INSPECT SHIFT SOLENOID VALVE SLU AND SLT
| *a | Component without harness connected
(Shift Solenoid Valve) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| Measurement Condition | Specified Condition |
|---|---|
·
Battery positive (+) with a 21 W bulb → Terminal 2 ·
Battery negative (-) → Terminal 1 |
Valve moves and makes an operating noise |
If the result is not as specified, replace the solenoid valve.
3.INSPECT SHIFT SOLENOID VALVE SL1 AND SL2
| *a | Component without harness connected
(Shift Solenoid Valve) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| Measurement Condition | Specified Condition |
|---|---|
·
Battery positive (+) with a 21 W bulb → Terminal 1 ·
Battery negative (-) → Terminal 2 |
Valve moves and makes an operating noise |
If the result is not as specified, replace the solenoid valve.
4.INSPECT SHIFT SOLENOID VALVE S1
| *a | Component without harness connected
(Shift Solenoid Valve S1) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body | 20°C (68°F) | 11 to 15 Ω |
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| Measurement Condition | Specified Condition |
|---|---|
·
Battery positive (+) → Shift solenoid valve S1 connector ·
Battery negative (-) → Shift solenoid valve S1 body |
Valve moves and makes an operating noise |
If the result is not as specified, replace the solenoid valve.
5.INSPECT SHIFT SOLENOID VALVE S2
| *a | Component without harness connected
(Shift Solenoid Valve S2) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body | 20°C (68°F) | 11 to 15 Ω |
Apply 12 V of battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
| Measurement Condition | Specified Condition |
|---|---|
·
Battery positive (+) → Shift solenoid valve S2 connector ·
Battery negative (-) → Shift solenoid valve S2 body |
Valve moves and makes an operating noise |
If the result is not as specified, replace the solenoid valve.