Home › Drivetrain › R150 / R151 / R156 MANUAL TRANSMISSION / TRANSAXLE › OUTPUT SHAFT › 2011.10–2012.10
RM1840EF _52 Drivetrain _009614 R150 / R151 / R156 MANUAL TRANSMISSION / TRANSAXLE _0052522 OUTPUT SHAFT A

R150 / R151 / R156 MANUAL TRANSMISSION / TRANSAXLE  OUTPUT SHAFT  REASSEMBLY  


PROCEDURE

Hide 1.INSTALL NO. 2 TRANSMISSION HUB SLEEVE

a.
D033571

Install the 3 No. 2 synchromesh shifting key springs and 3 synchromesh shifting keys to the No. 2 clutch hub.

NOTICE:

Be careful of the direction of the No. 2 hub sleeve and that of the No. 2 clutch hub.



b.

Apply gear oil to the sliding part of the No. 2 hub sleeve, and install it to the No. 2 clutch hub.


Hide 2.INSTALL 3RD GEAR NEEDLE ROLLER BEARING

a.
C089845

Apply gear oil to the needle roller bearing, and install it to the output shaft.


Hide 3.INSTALL 3RD GEAR

a.
D026080

Apply gear oil to the 3rd gear, and install it to the output shaft.


Hide 4.INSTALL NO. 2 SYNCHRONIZER RING (FOR 3RD GEAR)

a.
D026081

Apply gear oil to the No. 2 synchronizer ring, and install it to the 3rd gear.


Hide 5.INSTALL NO. 2 TRANSMISSION CLUTCH HUB

a.
D026082
2.26,0.594 1.969,0.594 false 2.313,0.479 2.625,0.688 0.313,0.208 10 false SST

Using SST and a press, press in the No. 2 clutch hub to the output shaft.

SST
09608-06041  

NOTICE:
·

Install the hub while aligning the key groove of the hub and the shifting key position.

·

The 3rd gear should be able to rotate smoothly.




b.

Select a snap ring so that the clearance between the No. 2 clutch hub and snap ring is within the specification.

Standard clearance:

0.10 mm (0.00393 in.) or less


Snap Ring Thickness:
Mark Thickness
A 1.80 to 1.85 mm (0.0709 to 0.0728 in.)
B 1.85 to 1.90 mm (0.0728 to 0.0748 in.)
C 1.90 to 1.95 mm (0.0748 to 0.0768 in.)
D 1.95 to 2.00 mm (0.0768 to 0.0787 in.)
E 2.00 to 2.05 mm (0.0787 to 0.0807 in.)
F 2.05 to 2.10 mm (0.0807 to 0.0827 in.)
G 2.10 to 2.15 mm (0.0827 to 0.0846 in.)



c.
D026059

Using a snap ring expander, install the snap ring.


Hide 6.INSTALL 2ND GEAR NEEDLE ROLLER BEARING

a.
C089844

Apply gear oil to the needle roller bearing, and install it to the output shaft.


Hide 7.INSTALL 2ND GEAR

a.
D026084

Apply gear oil to the 2nd gear, and install it to the output shaft.


Hide 8.INSTALL NO. 1 SYNCHRONIZER RING SET (FOR 2ND GEAR)

a.
D029127

Apply gear oil to the No. 1 synchronizer ring set, and install it to the 2nd gear.


Hide 9.INSTALL REVERSE GEAR

a.
D026083

Using a screwdriver, install the 3 synchromesh shifting key springs and 3 No. 1 synchromesh shifting keys to the No. 1 clutch hub.


b.

Apply gear oil to the reverse gear, and install it to the No. 1 clutch hub.


Hide 10.INSTALL NO. 1 TRANSMISSION CLUTCH HUB

a.
D026086
2.01,1.823 2.604,1.823 true 2.656,1.719 3,1.917 0.344,0.198 10 false SST

Using SST and a press, press in the No. 1 clutch hub to the output shaft.

SST
09316-60011  (09316-00041)

NOTICE:
·

While performing this step, make sure that the No. 1 synchronizer ring key groove and No. 1 synchromesh shifting key position are aligned.

·

The 1st gear should rotate freely.




b.

Select a snap ring so that the thrust clearance between the No. 1 clutch hub and snap ring is within the specification.

Standard clearance:

0.10 mm (0.00393 in.) or less


Snap Ring Thickness:
Mark Thickness
A 2.30 to 2.35 mm (0.0906 to 0.0925 in.)
B 2.35 to 2.40 mm (0.0925 to 0.0945 in.)
C 2.40 to 2.45 mm (0.0945 to 0.0965 in.)
D 2.45 to 2.50 mm (0.0965 to 0.0984 in.)
E 2.50 to 2.55 mm (0.0984 to 0.1004 in.)
F 2.55 to 2.60 mm (0.1004 to 0.1024 in.)
G 2.60 to 2.65 mm (0.1024 to 0.1043 in.)



c.
D026087

Using a brass bar and hammer, tap on the snap ring.


Hide 11.INSTALL 1ST GEAR BEARING SPACER

a.
C089843

Apply gear oil to the bearing spacer, and install it to the output shaft.


Hide 12.INSTALL 1ST GEAR NEEDLE ROLLER BEARING

a.
C089842

Apply gear oil to the needle roller bearing, and install it to the output shaft.


Hide 13.INSTALL 1ST GEAR THRUST WASHER PIN

a.
C281933

Install the thrust washer pin to the output shaft.


Hide 14.INSTALL NO. 1 SYNCHRONIZER RING SET (FOR 1ST GEAR) (for 1KD-FTV, 2KD-FTV)

a.
D029120

Apply gear oil to the No. 1 synchronizer ring set, and install it to the output shaft.


Hide 15.INSTALL NO. 1 SYNCHRONIZER RING (FOR 1ST GEAR) (for TR Series Engine)

a.
D026051

Apply gear oil to the No. 1 synchronizer ring, and install it to the output shaft.


Hide 16.INSTALL 1ST GEAR

a.
D026089

Apply gear oil to the 1st gear, and install it to the output shaft.


Hide 17.INSTALL 1ST GEAR THRUST WASHER

a.
D026090

Apply gear oil to the thrust washer, and install it to the output shaft.


Hide 18.INSTALL OUTPUT SHAFT CENTER BEARING

a.
D026091
2.24,1.708 2.698,1.292 true 2.688,1.115 3.021,1.313 0.333,0.198 10 false SST

Using SST and a press, press in a new center bearing to the output shaft.

SST
09316-60011  (09316-00031)

NOTICE:

Install the bearing so that the snap ring groove of the bearing faces rearward.



Hide 19.INSTALL 5TH GEAR

a.
D026092
1.865,1.708 2.271,1.375 true 2.302,1.198 2.646,1.396 0.344,0.198 10 false SST

Using SST and a press, press in the 5th gear to the output shaft.

SST
09316-60011  (09316-00031)

NOTICE:
·

Check that the 5th gear and the spline of the output shaft fit before installing the 5th gear.

·

Install the 5th gear so that the convex part of the gear faces forward.