Home › Drivetrain › DRIVE SHAFT / PROPELLER SHAFT › FRONT PROPELLER SHAFT ASSEMBLY(for TDV Made) › from 2012.04
RM1840EF _52 Drivetrain _009617 DRIVE SHAFT / PROPELLER SHAFT _0052550 FRONT PROPELLER SHAFT ASSEMBLY(for TDV Made) A

DRIVE SHAFT / PROPELLER SHAFT  FRONT PROPELLER SHAFT ASSEMBLY(for TDV Made)  INSTALLATION  


PROCEDURE

Hide 1.INSTALL FRONT PROPELLER SHAFT ASSEMBLY

a.

Completely remove any oil or the like and clean the contact surfaces of the propeller shaft flange and transfer flange.


b.

Align the matchmarks on the propeller shaft flange and transfer flange.


c.

Install the propeller shaft with the 4 nuts and 4 washers.

Torque:
88 N*m (899 kgf*cm, 65 ft.*lbf)


d.

Completely remove any oil or the like and clean the contact surfaces of the propeller shaft flange and differential flange.


e.

Align the matchmarks on the propeller shaft flange and differential flange.


f.

Connect the propeller shaft with the 4 bolts, 4 nuts and 4 washers.

Torque:
88 N*m (899 kgf*cm, 65 ft.*lbf)


Hide 2.INSTALL NO.3 ENGINE UNDER COVER

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)