Home › Suspension › FRONT SUSPENSION › FRONT UPPER SUSPENSION ARM(for 2WD) › from 2012.10
RM1840EF _53 Suspension _009620 FRONT SUSPENSION _0052583 FRONT UPPER SUSPENSION ARM(for 2WD) G

FRONT SUSPENSION  FRONT UPPER SUSPENSION ARM(for 2WD)  INSPECTION  


PROCEDURE

Hide 1.INSPECT FRONT UPPER SUSPENSION ARM ASSEMBLY LH

F049920

a.

As shown in the illustration, move the ball joint stud back and forth 5 times before installing the nut.


b.

Using a torque wrench, turn the nut continuously at a rate of 2 to 4 seconds per turn and take the torque reading on the fifth turn.

Turning torque:

0.98 to 4.5 N*m (10 to 46 kgf*cm, 9 to 40 in.*lbf) or less



c.

Check for any cracks and grease leaks on the ball joint dust cover.