1.ADJUST COMPRESSOR OIL
When replacing the compressor with a new one after gradually releasing the refrigerant gas from the service valve, drain the following amount of oil from the new compressor before installation.
(Oil capacity inside new compressor: 80 + 15 cc (2.7 + 0.5 fl. oz)) - (Remaining oil amount in the removed compressor) = (Oil amount to be removed when replacing)
When checking the compressor oil level, follow the A/C system's precautions.
Since compressor oil remains in the pipes of the vehicle, if a new compressor is installed without removing some oil inside, the oil amount becomes excessive. Excessive oil prevents heat exchange in the refrigerant cycle and causes refrigerant failure.
If the remaining oil in the removed compressor is too low, check for oil leakage.
Be sure to use ND-OIL 8 for compressor oil.
2.INSTALL COOLER COMPRESSOR ASSEMBLY
Install the cooler compressor assembly with the 4 bolts and tighten the bolts in the order shown in the illustration.
Connect the connector.
3.INSTALL NO. 1 COOLER REFRIGERANT DISCHARGE HOSE
Remove the vinyl tape attached to the No. 1 cooler refrigerant discharge hose.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor.
ND-OIL 8 or equivalent
Install the O-ring to the No. 1 cooler refrigerant discharge hose.
Connect the No. 1 cooler refrigerant discharge hose with the bolt.
4.INSTALL SUCTION HOSE SUB-ASSEMBLY
Remove the vinyl tape attached to the suction hose sub-assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor.
ND-OIL 8 or equivalent
Install the O-ring to the suction hose sub-assembly.
Connect the suction hose sub-assembly with the bolt.
5.INSTALL FAN AND GENERATOR V BELT
6.CHARGE REFRIGERANT
7.WARM UP ENGINE
8.CHECK FOR LEAKAGE OF REFRIGERANT