1.INSTALL NO. 1 ROOF WIRE
Position the positioning tape as shown in the illustration and install the No. 1 roof wire.
Apply tape in the order shown in the illustration to fix the No. 1 roof wire in place.
Adjust any slack of the No. 1 roof wire as indicated by the dashed lines in the illustration and apply tape.
| *A | w/o Map Light | *B | w/ Map Light |
| *1 | Positioning Tape | - | - |
2.INSTALL ROOF HEADLINING PACKING
| *1 | Packing |
| *2 | Marking |
Use the same procedure for both roof headlining packings.
Align a new roof headlining packing with the markings on the roof headlining and install the roof headlining packing to the position shown in the illustration using a double-sided tape.