1.REMOVE DEFOGGER RELAY
Remove the defogger relay from the relay block No. 3.
2.INSPECT DEFOGGER RELAY
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Battery voltage applied to terminals 1 and 2 | 10 kΩ or higher |
| Battery voltage not applied to terminals 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the defogger relay.
3.INSTALL DEFOGGER RELAY
Install the defogger relay to the relay block No. 3.