Home › Vehicle Exterior › EXTERIOR PANELS / TRIM › ROOF DRIP SIDE FINISH MOULDING › 2011.10–2012.10
RM1840EF _59 Vehicle Exterior _009657 EXTERIOR PANELS / TRIM _0052840 ROOF DRIP SIDE FINISH MOULDING A

EXTERIOR PANELS / TRIM  ROOF DRIP SIDE FINISH MOULDING  INSTALLATION  


CAUTION / NOTICE / HINT

HINT:
·

Use the same procedure for the RH and LH sides.

·

The procedure listed below is for the LH side.



PROCEDURE

Hide 1.INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

NOTICE:
·

It is only necessary to perform this procedure when replacing a No. 1 roof drip side finish moulding clip with a new one.

·

If installing new No. 1 roof drip side finish moulding clips, remove the adhesive remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.



HINT:

When installing the No. 1 roof drip side finish moulding clip, heat the vehicle body and No. 1 roof drip side finish moulding clip using a heat light.


Standard:
Item Temperature
Vehicle Body 40 to 60°C (104 to 140°F)
No. 1 Roof Drip Side Finish Moulding Clip 20 to 30°C (68 to 86°F)


NOTICE:

Do not heat the vehicle body or No. 1 roof drip side finish moulding clip excessively.


a.
B187426
2.052,0.823 2.365,0.823 false 0.979,1.073 1.219,1.073 1.219,1.073 1.333,1.531 true 1.854,0.708 2.083,0.896 0.229,0.188 10 false *1 0.781,0.958 1.063,1.188 0.281,0.229 10 false *a
*1 Adhesive
*a 2 to 3 mm Bead of Adhesive


Apply a 2.0 to 3.0 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new No. 1 roof drip side finish moulding clips.

HINT:

Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1991 psi) or more (when the temperature is 23°C (73°F))



b.

Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.

NOTICE:

Do not let the primer dry.



c.
B281125
0.365,2.417 0.708,2.729 0.344,0.313 10 false *B 0.365,0.323 0.698,0.594 0.333,0.271 10 false *A 0.948,1.177 1.135,1.427 0.188,0.25 10 false A 2.198,1.563 2.385,1.813 0.188,0.25 10 false B 1.052,3.188 1.24,3.438 0.188,0.25 10 false C 2.313,3.583 2.5,3.833 0.188,0.25 10 false D
*A for Single Cab
*B for Double Cab


While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the No. 1 roof drip side finish moulding clip after lightly pressing it so that the adhesive adheres to the primer.

Standard:
Area Measurement (Reference Value)
A 40.7 mm (1.60 in.)
B 47.6 mm (1.87 in.)
C 40.7 mm (1.60 in.)
D 39.2 mm (1.54 in.)


NOTICE:

Install the roof drip side finish moulding when 40 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.


HINT:
·

Initial hardening time: 40 minutes

·

Complete hardening time: 48 hours




Hide 2.INSTALL ROOF DRIP SIDE FINISH MOULDING LH

a.

Attach the 2 clips to install the roof drip side finish moulding.