Home › ENGINE ยท 2TR-FBE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PCV VALVE SUB-ASSEMBLY


    A253711E02
  1. Apply a light coat of engine oil to the O-ring.

  1. Install the PCV valve sub-assembly.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    HINT:
    When reusing the PCV valve sub-assembly, inspect the O-ring.

  1. Connect the PCV hose to the PCV valve sub-assembly.

  1. Secure the hose with the clamp.



2. CONNECT WIRE HARNESS
  1. Attach the wire harness clamp.